Closing soon

Sahuara and Copper/Flower Bicycle Boulevards - FHWA RFP

Description: Work includes 2 LS removal of structures & obstructions; 606 SY removal of bituminous pavement; 2 LS removal of signs and delineators; 204 SY asphaltic concrete (miscellaneous paving); 23 EA asphaltic concrete (speed hump); 4 EA sewer manhole, adjustment; 5 EA potable water, adjust valve box and cover; 14 EA utility potholing, depth less than twelve feet (12'); 7 EA utility potholing, depth twelve feet (12') and greater; 2,220 LF sign post (perforated) (single); 210 EA foundation for sign post (perforated); 9 EA sign mount assemblies (pole mounted) (metro signs). See attached file.

Buyer
City of Tucson

City · AZ, US

Released
Sep 24, 2026
Closes
Nov 3, 2026(5 days left)
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts