Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide maintenance dredging and CDF.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The contract work will consist of maintenance dredging.
Posted Date
Dec 30, 2025
Due Date
Mar 2, 2026
Release: Dec 30, 2025
Close: Mar 2, 2026
The contract work will consist of maintenance dredging.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Harbor maintenance dredging. Remove approx. 180,000 CY of accumulated sediment across the three project features.
Posted Date
Oct 17, 2025
Due Date
Nov 5, 2028
Release: Oct 17, 2025
Close: Nov 5, 2028
Harbor maintenance dredging. Remove approx. 180,000 CY of accumulated sediment across the three project features.
Available2,955 CY dredging; hauling and disposal of dredged material, environmental pollution control, including biological monitoring and maintenance and removal of environmental pollution control measures, in place complete.
Posted Date
Jan 23, 2026
Due Date
Feb 19, 2026
Release: Jan 23, 2026
Close: Feb 19, 2026
2,955 CY dredging; hauling and disposal of dredged material, environmental pollution control, including biological monitoring and maintenance and removal of environmental pollution control measures, in place complete.
AvailableBase work shall include dredging of the canal from Station 00+000 to Station 250+440. From Station 99+000 to Station 250+440 dredging will be required to a depth of 35’ MLLW (Datum) plus 1’ allowable over dredge and to a distance of 25 feet outside the channel limits where shoaling occurs along the channel edge within the authorized channel limits. Dredging will be required to a depth of 36’ MLLW (Datum) plus 1’ allowable overdepth within the contract work limits shown on the drawings from station 00+000 to station 250+440, with no side slopes delineated and/or paid for.
Posted Date
Jan 22, 2026
Due Date
Feb 6, 2026
Release: Jan 22, 2026
Close: Feb 6, 2026
Base work shall include dredging of the canal from Station 00+000 to Station 250+440. From Station 99+000 to Station 250+440 dredging will be required to a depth of 35’ MLLW (Datum) plus 1’ allowable over dredge and to a distance of 25 feet outside the channel limits where shoaling occurs along the channel edge within the authorized channel limits. Dredging will be required to a depth of 36’ MLLW (Datum) plus 1’ allowable overdepth within the contract work limits shown on the drawings from station 00+000 to station 250+440, with no side slopes delineated and/or paid for.