CityPA
Posted
Aug 28, 2026
Sep 11, 2026
Ashwood Drive Stormwater Improvements Project RFP
Replacement of existing curb, installation of stormwater inlets and pipes, pavement restoration, and maintenance and protection of traffic.
Description: Work includes approx. of 70 LF of install 6" water main; 10 LF of install 8" sanitary sewer; 40 LF of install 24" CMP storm drain pipe; 20 LF of install 18" RCP storm drain pipe; 2,167 LF of rotomilling surface of asphalt pavement; 2,399 SY of 2.5" asphaltic concrete paving; 1,179 SY of 6" asphaltic concrete paving; 540 SF of install replacement concrete valley gutter (8").
City · WY, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalDecision makers connected to this RFP from City of Gillette.
Adjacent opportunities open for bidding right now.
CityPA
Posted
Aug 28, 2026
Sep 11, 2026
Replacement of existing curb, installation of stormwater inlets and pipes, pavement restoration, and maintenance and protection of traffic.
CityTX
Posted
Aug 26, 2026
Sep 2, 2026
Project includes the construction of new sidewalks.
Kansas Department of Transportation
State AgencyKS
Posted
Aug 19, 2026
Sep 16, 2026
Work includes approx 1 LS clearing and grubbing; 2,204 CY common excavation; 219 LF 4" pipe underdrain (H); 170 LF 3" electric conduit; 1 LS water system/non part; 250 LF (RCPHE) (3 SF) storm sewer; 1,498 SY erosion control.
CityPA
Posted
Aug 8, 2026
Sep 1, 2026
Replacement of the existing storm water pipe and storm water inlet. New pre-cast concrete and HDPE end walls to be installed.