Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
125 LF of 8" PVC; 790 LF of 8" PVC; 35 LF of HDPE service line (All Sizes); 3 ea of 8: gate valve and box; 1 ea line stop; 4 ea of 3/4" service connection set; 1 ea of 2" service connection set; 1 ea connection to existing water line; 1 ea tapping sleeve and valve; 1,220 SY lawn/open space restoration; 90 SY bituminous wearing course pavement; 90 SY bituminous base course pavement; 6 LF concrete curb.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Project involves replacing approx 700 LF of existing 4" iron water main with new 8" polyethylene encased ductile iron water main.
Posted Date
Jan 21, 2026
Due Date
Feb 12, 2026
Release: Jan 21, 2026
Close: Feb 12, 2026
Project involves replacing approx 700 LF of existing 4" iron water main with new 8" polyethylene encased ductile iron water main.
AvailableMain Street Sidewalk Improvement Project contract generally described as follows: Sidewalk improvements on Main Street between S Todd Street and S Broadway Street including, but not limited to pavement removals, roadway lighting, curb and gutter, sidewalk, traffic control, surface restoration, and other associated appurtenances as specified and indicated on the drawings.
Posted Date
Jan 12, 2026
Due Date
Jan 27, 2026
Release: Jan 12, 2026
Close: Jan 27, 2026
Main Street Sidewalk Improvement Project contract generally described as follows: Sidewalk improvements on Main Street between S Todd Street and S Broadway Street including, but not limited to pavement removals, roadway lighting, curb and gutter, sidewalk, traffic control, surface restoration, and other associated appurtenances as specified and indicated on the drawings.
Main Street Sidewalk Improvement Project contract generally described as follows: Sidewalk improvements on Main Street between S Todd Street and S Broadway Street including, but not limited to pavement removals, roadway lighting, curb and gutter, sidewalk, traffic control, surface restoration, and other associated appurtenances as specified and indicated on the drawings.
Posted Date
Jan 12, 2026
Due Date
Jan 27, 2026
Release: Jan 12, 2026
Close: Jan 27, 2026
Main Street Sidewalk Improvement Project contract generally described as follows: Sidewalk improvements on Main Street between S Todd Street and S Broadway Street including, but not limited to pavement removals, roadway lighting, curb and gutter, sidewalk, traffic control, surface restoration, and other associated appurtenances as specified and indicated on the drawings.
The City of Philomath invites bids to reconstruct South 11th Street and South 12th Street between Main Street and Applegate Street (approximately 300 feet each). The base bid is full reconstruction of S. 12th Street with curbs, sidewalks, and parking on both sides, and S. 11th Street is an additive alternate with three‑quarter‑width reconstruction; the work includes a city‑provided EV charging station on 12th Street and new street lights on both streets. Sealed bids are due by 2:00 p.m. local time on February 25, 2026, and bid documents are available via Westech Engineering’s QuestCDN portal.
Posted Date
Jan 26, 2026
Due Date
Feb 25, 2026
Release: Jan 26, 2026
Close: Feb 25, 2026
The City of Philomath invites bids to reconstruct South 11th Street and South 12th Street between Main Street and Applegate Street (approximately 300 feet each). The base bid is full reconstruction of S. 12th Street with curbs, sidewalks, and parking on both sides, and S. 11th Street is an additive alternate with three‑quarter‑width reconstruction; the work includes a city‑provided EV charging station on 12th Street and new street lights on both streets. Sealed bids are due by 2:00 p.m. local time on February 25, 2026, and bid documents are available via Westech Engineering’s QuestCDN portal.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis