Moriches Island Road Stormwater Mitigation Project RFP
Work include drainage improvement.
Description: Work includes limb trimming, removal and disposal of existing pavement 2,119.000 SY, removal of exist guardrail 170.000 LF, unclassified excavation 324.000 CY, borrow excavation 1,188.000 CY, maintenance stone 57.270 Ton, liquid asphalt binder pg64-22 246.840 Ton, full depth asph pav patching 8" unif 5,749.910 SY, milling existing asphalt pavement 2.0" 40,248.600 SY, milling existing asphalt pavement (variable) 488.890 SY, asphalt surface course type b 4,024.000 Ton, 4"yellow solid line (pvt edge&no passing zone) fast dry paint 72,800.000 LF. See attached file.
StateAgency · SC, US
From the first pre-RFP signals to the published RFP and its files.
Strategic plan
566 days before RFP
SCDOT identified an additional $5 million in annual funding needed for its guardrail program.
Guardrails enhance the safety of the traveling public by preventing vehicles from going off the roadway and encountering hazards such as trees, water features, and rugged terrain. SCDOT's guardrail program currently totals $15 million annually. Following a thorough analysis of its guardrail program, SCDOT has identified an additional $5 million in annual…
South Carolina Department of Transportation Statewide Multimodal Transportation Plan 2050
Strategic plan · Mar 20, 2025
Board meeting
503 days before RFP
The SCDOT Commission approved ranked major-road, secondary-road and neighborhood-street reconstruction and rehabilitation projects as part of the 2025-2026 Pavement Improvement Program.
MOTION 2: Primary and Secondary Routes Motion By: Vice Chair Dukes Second By: Commissioner Blackwell "In accordance with Act 114 of 2007, which requires the SCDOT Commission to select projects for funding based on objective and quantifiable factors, the Commission approves the Secretary's recommended ranked project lists for the reconstruction and…
South Carolina Department of Transportation Commission Commission Meeting
Board meeting · May 22, 2025
Board meeting
139 days before RFP
The SCDOT Commission approved the recommended 2026-2027 pavement improvement program and authorized adjustments for projected-versus-actual funding and expense variances.
>> Sure. I make a motion in accordance with the commission approved transportation asset management plan and the 10-year plan for rebuilding South Carolina's roads. The commission approves the recommended 2026-2027 pavement improvement program. The secretary is authorized to adjust the program as necessary in the future to align to projected versus actual…
South Carolina Department of Transportation Committee Commission Meeting
Board meeting · May 21, 2026
Board meeting
20 days before RFP
SCDOT proposed FY28 recurring budget requests including $100 million for safety, divided between rural roads and urban corridors.
So, the proposed recurring budget requests um for this year uh $250 million for uh pavements, $250 million for bridges. That's really to uh the $250 million in payments really puts us back to where we were prior to the p uh cost increase. So basically gets their production back up to closer to 1,000 m per year as opposed to 700 m per year. Uh bridges is…
South Carolina Department of Transportation Commission Commission Meeting
Board meeting · Sep 17, 2026
RFP published
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalProposals due (6 days left)
Adjacent opportunities open for bidding right now.
CityNY
Posted
Oct 29, 2026
Nov 19, 2026
Work include drainage improvement.
Orange Water And Sewer Authority
Special DistrictNC
Posted
Oct 26, 2026
Dec 3, 2026
Single-prime lump-sum general construction to replace seven 24-inch butterfly valves and six slide gates, install a polymer application point, and provide associated appurtenances at the Jones Ferry Road WTP.
CountyNC
Posted
-
Nov 19, 2026
Work includes stream grading, installing rock and wood habitat and stabilization structures, erosion control measures, dry pond installation, and riparian vegetation, approx 473 LF of sanitary sewer relocation.
CityAL
Posted
-
Dec 8, 2026
Approximately 2,300 feet of full-depth road reclamation, with alternate surface treatment and asphalt placement work.