Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The construction of a new water supply well; including well building, site work, electrical, along with approx. 8,350 LF of 12" potable water main, 2,560 LF of 20" raw water main, approx. 8270 LF of 6" sanitary sewer force main and related appurtenances.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work includes approx. 1,010 LF of drill 6" diameter minimum exploration pilot borehole; 850 LF of drill, ream, and condition 19" minimum diameter bore hole; 160 LF of drill, ream 26" diameter borehole; 160 LF of drill and install 22" minimum temporary conductor casing; 602 LF of furnish and install 14" HSLA production casing; 400 LF of furnish and install 14" HSLA production screen; 750 CF of furnish and install gravel pack filter material; 375 CF of furnish and install surface seal-grout; see outside links for more details.
Posted Date
Nov 21, 2025
Due Date
Dec 18, 2025
Release: Nov 21, 2025
Close: Dec 18, 2025
Work includes approx. 1,010 LF of drill 6" diameter minimum exploration pilot borehole; 850 LF of drill, ream, and condition 19" minimum diameter bore hole; 160 LF of drill, ream 26" diameter borehole; 160 LF of drill and install 22" minimum temporary conductor casing; 602 LF of furnish and install 14" HSLA production casing; 400 LF of furnish and install 14" HSLA production screen; 750 CF of furnish and install gravel pack filter material; 375 CF of furnish and install surface seal-grout; see outside links for more details.
Premium
Access the largest public sector contact database
Construction of a culinary water production well to serve as a backup well.
Posted Date
Nov 17, 2025
Due Date
Dec 16, 2025
Release: Nov 17, 2025
Close: Dec 16, 2025
Construction of a culinary water production well to serve as a backup well.
AvailableSan Joaquin County is soliciting qualifications for a progressive design-build contractor to deliver the BE WELL Phase 2 Campus, including multiple residential/treatment buildings, a support building, sitework, parking, landscaping, and amenities. The project is planned in two phases (Preconstruction and Construction), with an estimated construction budget of approximately $60,000,000 and expected completion in 2029. The selected contractor will perform programming, design development, permitting, and construct the project while participating in partnering and milestone reviews.
Posted Date
Nov 26, 2025
Due Date
Feb 13, 2026
Release: Nov 26, 2025
Close: Feb 13, 2026
San Joaquin County is soliciting qualifications for a progressive design-build contractor to deliver the BE WELL Phase 2 Campus, including multiple residential/treatment buildings, a support building, sitework, parking, landscaping, and amenities. The project is planned in two phases (Preconstruction and Construction), with an estimated construction budget of approximately $60,000,000 and expected completion in 2029. The selected contractor will perform programming, design development, permitting, and construct the project while participating in partnering and milestone reviews.
AvailableRFP for Ground Water Production Well SM-14 drilling services.
Posted Date
Nov 25, 2025
Due Date
Dec 31, 2099
Release: Nov 25, 2025
Close: Dec 31, 2099
RFP for Ground Water Production Well SM-14 drilling services.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis