Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes approx 13,000 LF 30" DIP raw water main - push on joint (labor only); 310 LF 48: steel casing by jack and bore; 255 LF 30" stream crossing; 131 LF 18" RCP storm sewer; 1,500m CY rock excavation. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The City of Yonkers is soliciting bids to replace approximately 300 linear feet of 30-inch cast iron water main under the Saw Mill River Parkway, including valves, hydrants, and approximately 142 feet of 42-inch steel casing under the parkway. Bidders must document MWBE and SDVOB participation efforts and comply with New York State Environmental Facilities Corporation grant funding requirements.
Posted Date
May 16, 2025
Due Date
Jun 12, 2026
Release: May 16, 2025
Close: Jun 12, 2026
The City of Yonkers is soliciting bids to replace approximately 300 linear feet of 30-inch cast iron water main under the Saw Mill River Parkway, including valves, hydrants, and approximately 142 feet of 42-inch steel casing under the parkway. Bidders must document MWBE and SDVOB participation efforts and comply with New York State Environmental Facilities Corporation grant funding requirements.
Premium
Access the largest public sector contact database
Work includes approx 2,318 LF of 30" RJ DIP waterline; 10 TN fittings; 60 LF of cut and replace asphalt roadway; 2,539 SY mill and inlay asphalt. See outside link.
Posted Date
Dec 18, 2025
Due Date
Jan 23, 2026
Release: Dec 18, 2025
Close: Jan 23, 2026
Work includes approx 2,318 LF of 30" RJ DIP waterline; 10 TN fittings; 60 LF of cut and replace asphalt roadway; 2,539 SY mill and inlay asphalt. See outside link.
AvailableWater main replacement. This project consists of the replacement of approx 987' and installation of approx 405' of 8" DIP water main, replacement of approx 10' and installation of approx 22' of 10" DIP water main, replacement of approx 55 and installation of approx 54' of 12" DIP water main, replacement of approx 2,343' and installation of approx 2,916' of 24" DIP water main, replacement of approx 2,343' and installation of approx 2,916' of 24" DIP water main, installation of 18 fire hydrants and 125 water house connections.
Posted Date
Dec 14, 2025
Due Date
Jan 20, 2026
Release: Dec 14, 2025
Close: Jan 20, 2026
Water main replacement. This project consists of the replacement of approx 987' and installation of approx 405' of 8" DIP water main, replacement of approx 10' and installation of approx 22' of 10" DIP water main, replacement of approx 55 and installation of approx 54' of 12" DIP water main, replacement of approx 2,343' and installation of approx 2,916' of 24" DIP water main, replacement of approx 2,343' and installation of approx 2,916' of 24" DIP water main, installation of 18 fire hydrants and 125 water house connections.
AvailableFurnish and install approximately 955 feet of 8-inch HDPE pipe and 965 feet of 6-inch PVC raw water main pipe. Also included are three (3) directional drills, valves, connections, restoration, the equipping of two (2) potable water supply wells and providing two (2) generators.
Posted Date
Nov 12, 2025
Due Date
Jan 8, 2026
Release: Nov 12, 2025
Close: Jan 8, 2026
Furnish and install approximately 955 feet of 8-inch HDPE pipe and 965 feet of 6-inch PVC raw water main pipe. Also included are three (3) directional drills, valves, connections, restoration, the equipping of two (2) potable water supply wells and providing two (2) generators.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis