Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes approx 2,318 LF of 30" RJ DIP waterline; 10 TN fittings; 60 LF of cut and replace asphalt roadway; 2,539 SY mill and inlay asphalt. See outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Construction of approx. 17,000 LF of 30" diameter potable water transmission main, to replace an existing transmission main, including fittings, valves, vaults, combination air release valves and low point blow-off and drain assemblies; connections to existing distribution and transmission mains; abandonment of existing water distribution and transmission mains; the transmission main replacement includes two horizontal directional bore and an auger bore casing installation under Hwy 101; approx. 3,600 LF of 12" and 16" diameter potable water distribution line feeding the Port of Tillamook Bay, to replace an existing distribution line, including fittings, valves, vaults, combination air release valves and low point blow-off and drain assemblies; the service line includes pipe installation involving HDD and auger bore techniques; surface restoration, pavement restoration, traffic control and the performance of any other work.
Posted Date
Nov 28, 2025
Due Date
Jan 8, 2026
Release: Nov 28, 2025
Premium
Access the largest public sector contact database
Close: Jan 8, 2026
Construction of approx. 17,000 LF of 30" diameter potable water transmission main, to replace an existing transmission main, including fittings, valves, vaults, combination air release valves and low point blow-off and drain assemblies; connections to existing distribution and transmission mains; abandonment of existing water distribution and transmission mains; the transmission main replacement includes two horizontal directional bore and an auger bore casing installation under Hwy 101; approx. 3,600 LF of 12" and 16" diameter potable water distribution line feeding the Port of Tillamook Bay, to replace an existing distribution line, including fittings, valves, vaults, combination air release valves and low point blow-off and drain assemblies; the service line includes pipe installation involving HDD and auger bore techniques; surface restoration, pavement restoration, traffic control and the performance of any other work.
AvailableWork inlcudes 6", 16", 18", and 24" DIP water main installed by open cut and horizontal directional bore construction methods, including: pavement removal; trench excavation; water main pipe materials and installation; valves and valve vaults; fire hydrant assemblies including hydrant and auxiliary valve; water service connections; pipe bedding; trench backfill; pavement replacement; driveway replacement; curb and gutter replacement; parkway restoration; traffic control; water main pressure testing and disinfection. See outside link.
Posted Date
Nov 17, 2025
Due Date
Jan 9, 2026
Release: Nov 17, 2025
Close: Jan 9, 2026
Work inlcudes 6", 16", 18", and 24" DIP water main installed by open cut and horizontal directional bore construction methods, including: pavement removal; trench excavation; water main pipe materials and installation; valves and valve vaults; fire hydrant assemblies including hydrant and auxiliary valve; water service connections; pipe bedding; trench backfill; pavement replacement; driveway replacement; curb and gutter replacement; parkway restoration; traffic control; water main pressure testing and disinfection. See outside link.
AvailableWork inlcudes 6", 16", 18", and 24" DIP water main installed by open cut and horizontal directional bore construction methods, including: pavement removal; trench excavation; water main pipe materials and installation; valves and valve vaults; fire hydrant assemblies including hydrant and auxiliary valve; water service connections; pipe bedding; trench backfill; pavement replacement; driveway replacement; curb and gutter replacement; parkway restoration; traffic control; water main pressure testing and disinfection. See outside link.
Posted Date
Nov 17, 2025
Due Date
Jan 9, 2026
Release: Nov 17, 2025
Close: Jan 9, 2026
Work inlcudes 6", 16", 18", and 24" DIP water main installed by open cut and horizontal directional bore construction methods, including: pavement removal; trench excavation; water main pipe materials and installation; valves and valve vaults; fire hydrant assemblies including hydrant and auxiliary valve; water service connections; pipe bedding; trench backfill; pavement replacement; driveway replacement; curb and gutter replacement; parkway restoration; traffic control; water main pressure testing and disinfection. See outside link.
AvailableThe City of Riverton, Wyoming is requesting qualifications from engineering/consulting firms for the West Main Street Water Transmission Line Project. Statements of qualifications are due by 4:00 p.m. Mountain Time on January 7, 2026; questions are accepted until 4:00 p.m. on Tuesday, December 30. Specifications and communications are handled via the Public Purchase portal as indicated by the city’s notice.
Posted Date
Dec 13, 2025
Due Date
Jan 7, 2026
Release: Dec 13, 2025
Close: Jan 7, 2026
The City of Riverton, Wyoming is requesting qualifications from engineering/consulting firms for the West Main Street Water Transmission Line Project. Statements of qualifications are due by 4:00 p.m. Mountain Time on January 7, 2026; questions are accepted until 4:00 p.m. on Tuesday, December 30. Specifications and communications are handled via the Public Purchase portal as indicated by the city’s notice.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis