City of North Chicago
The City of North Chicago is soliciting sealed bids for Water Tower No. 1 and Transmission Main, Contract B, which includes installation of 6‑inch to 24‑inch ductile iron water main by open cut and horizontal directional drilling with associated appurtenances and restoration. Sealed bids are due at City Hall by 2:00 PM on January 9, 2026, with a mandatory pre‑bid conference on December 17, 2025.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Nicholasville
Work includes approx 20,350 LF of 24" ductile iron transmission main associated valves, road and creek crossings, and pavement replacement. See outside link.
Posted Date
Dec 4, 2017
Due Date
Dec 3, 2025
Release: Dec 4, 2017
City of Nicholasville
Close: Dec 3, 2025
Work includes approx 20,350 LF of 24" ductile iron transmission main associated valves, road and creek crossings, and pavement replacement. See outside link.
AvailableCity of Jackson
Work for this project includes the construction of approx. 1,222 LF of new eight-inch water main at four separate locations for the abandonment of approx. 2,115 LF of twenty-inch transmission main. Work includes 557 Ton HMA, 13A; 327 SF Det F4, modified concrete curb and gutter; 948 SF of concrete sidewalk; 808 SF of 6" concrete curb ramp; traffic control items; 313 SY of performance turf establishment; 594 LF of water main; 383 LF of water main, dir bore; 8 EA water valve and box; 2 EA water main, insertion valve; 271 LF of water service pipe; 5 EA bond restoration; 6 EA water service. See outside link for complete scope of work.
Posted Date
Oct 26, 2025
Due Date
Dec 11, 2025
Release: Oct 26, 2025
City of Jackson
Close: Dec 11, 2025
Work for this project includes the construction of approx. 1,222 LF of new eight-inch water main at four separate locations for the abandonment of approx. 2,115 LF of twenty-inch transmission main. Work includes 557 Ton HMA, 13A; 327 SF Det F4, modified concrete curb and gutter; 948 SF of concrete sidewalk; 808 SF of 6" concrete curb ramp; traffic control items; 313 SY of performance turf establishment; 594 LF of water main; 383 LF of water main, dir bore; 8 EA water valve and box; 2 EA water main, insertion valve; 271 LF of water service pipe; 5 EA bond restoration; 6 EA water service. See outside link for complete scope of work.
AvailableCity of Cleburne
Provide 16" water transmission main project improvements.
Posted Date
Oct 22, 2025
Due Date
Nov 20, 2025
Release: Oct 22, 2025
City of Cleburne
Close: Nov 20, 2025
Provide 16" water transmission main project improvements.
AvailableCentral Shoshone County Water District
Project includes the following Work: The District will replace the existing transmission main from the well and treatment plant near Enaville to the Smelterville Booster Station. The new transmission main will be constructed primarily of 24" C-900 PVC. The pipe alignment will generally parallel the Trail of the Coeur d'Alene's. The alignment includes 2 elevated crossings utilizing existing bridges over the South Fork Coeur d'Alene River and Pine Creek.
Posted Date
Nov 18, 2025
Due Date
Dec 15, 2025
Release: Nov 18, 2025
Central Shoshone County Water District
Close: Dec 15, 2025
Project includes the following Work: The District will replace the existing transmission main from the well and treatment plant near Enaville to the Smelterville Booster Station. The new transmission main will be constructed primarily of 24" C-900 PVC. The pipe alignment will generally parallel the Trail of the Coeur d'Alene's. The alignment includes 2 elevated crossings utilizing existing bridges over the South Fork Coeur d'Alene River and Pine Creek.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis