Summary
Work includes, 350 LF, Installation and Removal of Inlet Protection. 12,843 LF, Joint and Crack Repair. 42,438 SY, Cold Milling (0" - 4"). 3,000 SY, Pavement Patching, Complete. 3,264 CY, Embankment in Place (Contractor Furnished). 8,680 TON, Asphalt Mix Pavement - Overlay. 5,941 GAL, Emulsified Asphalt Tack Coat. 38,893 SF, Temporary Pavement Marking (White). 45,613 SF, Reflectorized Pavement Marking (White). 25,387 SF, Emulsified Asphalt Slurry Seal Surface Treatment
(Non-Eligible). 11,276 LF, #6 Bare Copper Counterpoise Direct Buried. 14,109 LF, #8 5kV L-824 Type C Cable in Conduit. 7,433 LF, (1) 2” PVC in Saw Kerf. 3,717 LF, (1) 2” PVC Direct Buried. 9 EA, Lighted Guidance Sign L-858L, Size 2 and Base.