Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project involves rehabilitation and reconstruction of portions of the pavements for the airport's primary 8,037' by 150' runway and the re-grading of the associated adjacent runway safety areas (rsas) out to a 500' overall width. Along with these paving and grading efforts, the project will include miscellaneous storm drainage improvements, runway edge lighting improvements, internally lit signage relocations, new supplemental wind cones, new precision approach path indicators (papis) for each runway end, and replacement of the runway 32 approach light system's threshold bar. This project 1 will focus on the rehabilitation of 2,500' of the runway's length at the runway 14 end and the reconstruction of 3,187' of the runway's length at the runway 32 end. Some key approximate quantities for the various paving and grading efforts include the following: removal to a 12" depth of 11,230 SY of light duty weathered asphalt in a paved overrun area, and re-grading with topsoil placement for turf establishment.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Repair asphalt runway 14-32, Section 10 - Phase 4. This project involves repairing Runway 14-32. The work includes, but is not limited to, paving, crack sealing, restriping, and other related construction activities necessary to restore the runway to operational standards.
Posted Date
Jan 23, 2026
Due Date
Feb 7, 2026
Release: Jan 23, 2026
Close: Feb 7, 2026
Repair asphalt runway 14-32, Section 10 - Phase 4. This project involves repairing Runway 14-32. The work includes, but is not limited to, paving, crack sealing, restriping, and other related construction activities necessary to restore the runway to operational standards.
AvailablePalm Beach County Department of Airports is inviting sealed bids for the Runway 10L-28R Rehabilitation at Palm Beach International Airport (Project PB 25-12). The work includes milling and overlay of the runway and blast pads, shoulder reconstruction, runway safety area grading, drainage improvements, markings, and electrical improvements including lighting and signage. Bids are due at 2:00 PM local time on February 10, 2026, with contract documents available through the County’s Vendor Self-Service portal.
Posted Date
-
Due Date
Feb 10, 2026
Close: Feb 10, 2026
Palm Beach County Department of Airports is inviting sealed bids for the Runway 10L-28R Rehabilitation at Palm Beach International Airport (Project PB 25-12). The work includes milling and overlay of the runway and blast pads, shoulder reconstruction, runway safety area grading, drainage improvements, markings, and electrical improvements including lighting and signage. Bids are due at 2:00 PM local time on February 10, 2026, with contract documents available through the County’s Vendor Self-Service portal.
This project includes: The rehabilitation and extension of Taxiway "F" at Airport. The runway 14-32 blast pad rehabilitation includes milling and overlaying the existing asphalt blast pads. Associated work items include the demolition of abandoned light base cans, re-working and re-grading the limerock subbase, and minor re-grading and re-sodding in the turf areas surrounding the blast pads.
Posted Date
Jan 21, 2026
Due Date
Feb 24, 2026
Release: Jan 21, 2026
Close: Feb 24, 2026
This project includes: The rehabilitation and extension of Taxiway "F" at Airport. The runway 14-32 blast pad rehabilitation includes milling and overlaying the existing asphalt blast pads. Associated work items include the demolition of abandoned light base cans, re-working and re-grading the limerock subbase, and minor re-grading and re-sodding in the turf areas surrounding the blast pads.
The Jacksonville Aviation Authority is soliciting competitive bids for the rehabilitation and extension of Taxiway F and the rehabilitation of the Runway 14-32 blast pad at Jacksonville International Airport. The project includes narrowing Taxiway F, extending it into undeveloped areas, and performing asphalt milling and overlay with related subbase rework and turf regrading. Bids are due by February 24, 2026, and a non-mandatory pre-bid conference is scheduled for February 3, 2026.
Posted Date
Jan 22, 2026
Due Date
Feb 24, 2026
Release: Jan 22, 2026
Close: Feb 24, 2026
The Jacksonville Aviation Authority is soliciting competitive bids for the rehabilitation and extension of Taxiway F and the rehabilitation of the Runway 14-32 blast pad at Jacksonville International Airport. The project includes narrowing Taxiway F, extending it into undeveloped areas, and performing asphalt milling and overlay with related subbase rework and turf regrading. Bids are due by February 24, 2026, and a non-mandatory pre-bid conference is scheduled for February 3, 2026.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis