Construct a 1,000 gpm triplex wastewater lift station including: Wet well and valve vault, electrical power and controls, pumps, piping and valves and a standby emergency generator; site work including sheet pile and solider pile shoring, cast-in-place concrete retaining wall, demolition of existing structure, excavation and haul, site grading, gravel surfacing and heated concrete driveway; site piping including 1" water service, hot box and RPBA; and site improvements including a jib crane, fencing and gates. Install approx. 1,100 LF of 8" gravity sewer mains and manholes. Install 900 LF of 10" and 12" pressure sewer mains. Restore asphalt surfacing, concrete curbing and sidewalk.