Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes ruggles station improvements.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes construction of lift station improvements.
Posted Date
Dec 16, 2025
Due Date
Jan 19, 2026
Release: Dec 16, 2025
Close: Jan 19, 2026
Work includes construction of lift station improvements.
AvailableReplacement of pump instrumentation, air relief valves, hydropneumatic air compressor, motor control center (MCC), main switch board (MSB), electrical services meter main, harmonic filters, variable frequency drives (VFDs), and ductile iron piping; coating rehabilitation, installation of safety features for underground vault accessibility, site pavement reconstruction, and sewer manhole improvements.
Posted Date
-
Due Date
Jan 13, 2026
Close: Jan 13, 2026
Replacement of pump instrumentation, air relief valves, hydropneumatic air compressor, motor control center (MCC), main switch board (MSB), electrical services meter main, harmonic filters, variable frequency drives (VFDs), and ductile iron piping; coating rehabilitation, installation of safety features for underground vault accessibility, site pavement reconstruction, and sewer manhole improvements.
AvailableReplacement of pump instrumentation, air relief valves, hydropneumatic air compressor, motor control center (MCC), main switch board (MSB), electrical services meter main, harmonic filters, variable frequency drives (VFDs), and ductile iron piping; coating rehabilitation, installation of safety features for underground vault accessibility, site pavement reconstruction, and sewer manhole improvements.
Posted Date
-
Due Date
Jan 13, 2026
Close: Jan 13, 2026
Replacement of pump instrumentation, air relief valves, hydropneumatic air compressor, motor control center (MCC), main switch board (MSB), electrical services meter main, harmonic filters, variable frequency drives (VFDs), and ductile iron piping; coating rehabilitation, installation of safety features for underground vault accessibility, site pavement reconstruction, and sewer manhole improvements.
AvailableNaval Facilities Engineering Command (NAVFAC) issued Solicitation N6247026R0006 for P919 Bulk Tank Fuel Farm Improvements and Pipeline Phase 1 at Naval Station Rota, Spain, requesting construction of tank farm and pipeline improvements. The solicitation includes site visit instructions, multiple attachments (including the primary solicitation PDF and technical volumes), and was amended on Dec 1, 2025 to respond to PPIs and provide revised documents. Proposals are due Jan 14, 2026 at 2:00 PM EST.
Posted Date
Nov 4, 2025
Due Date
Jan 14, 2026
Release: Nov 4, 2025
Close: Jan 14, 2026
Naval Facilities Engineering Command (NAVFAC) issued Solicitation N6247026R0006 for P919 Bulk Tank Fuel Farm Improvements and Pipeline Phase 1 at Naval Station Rota, Spain, requesting construction of tank farm and pipeline improvements. The solicitation includes site visit instructions, multiple attachments (including the primary solicitation PDF and technical volumes), and was amended on Dec 1, 2025 to respond to PPIs and provide revised documents. Proposals are due Jan 14, 2026 at 2:00 PM EST.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →