Pedestrian Intersection Improvements and Pavement Rehabilitation Project RFP
Construction of the pedestrian intersection improvements and pavement rehabilitation.
Description: Concrete sidewalks and concrete curbing on both sides filling gaps in the existing sidewalk network. Work also includes a culvert extension, drainage improvements, pedestrian lighting, signage, striping and new and replacement crosswalks. Additionally, traffic calming measures in the form of curbed islands also be installed.
City · NY, US
From the first pre-RFP signals to the published RFP and its files.
Board meeting
704 days before RFP
The Route 52 sidewalk-network completion project had a reported $1.5 million grant and was in design, with a hoped-for start the following year.
Engineer Bryant stated over last few years they have expanded upon the sidewalk network around Route 52 by John Jay and the industrial area. In addition to the sidewalk that was previously installed and the sidewalk installed during the development of the West Campus, there is a $1.5 million grant to complete that Town of East Fishkill Board Meeting Minutes…
Town Of East Fishkill Town Board Meeting Minutes
Board meeting · Nov 14, 2024
Engineer Bryant stated this needed to be separated out. It covers the lighting that is associated with the sidewalks. There are a lot of lights there now, but they will be adding more lights as part of the sidewalk project.
Town Of East Fishkill Town Board Meeting Minutes
Board meeting · Nov 14, 2024
Board meeting
641 days before RFP
The Town's Route 52 project planned to fill sidewalk gaps and add crossings, lighting, a raised median, curbing and culvert work from Corporate Park Drive to Stone Ridge, supported by a $1.7 million 80/20 federal-local construction budget with construction anticipated in 2025.
Town of East Fishkill Board Meeting Minutes -- January 16, 2025 3 Mr. Fitzgerald stated this is a federally funded project that is part of the Transportation Alternatives Program, Tap. It is a $1.7 million construction project with an 80/20% split on the funding. That means 80% is coming from the federal government and 20% is the local share. Route 52 has…
Strategic plan
430 days before RFP
Behan Planning and Design conducted a 2020 Route 52 land-use and zoning study for the Town that recommended exploring sidewalks, bike lanes, and a shared-use path.
Local Plans and Studies NYS Route 52 from Taconic Parkway to Blue Hill Road Land Use and Zoning Study (2020) This study was conducted by Behan Planning and Design for the Town of East Fishkill to provide guidance for the creation of a management plan for development along the NYS Route 52 from Taconic Parkway to Blue Hill Road highway corridor. The study…
Town of East Fishkill Comprehensive Plan
Strategic plan · Aug 15, 2025
Board meeting
165 days before RFP
The Town Board authorized advertising bids for a Route 52 commercial sidewalk district supported by an approximately $1.8 million state grant, a 20% match and a $2.242 million project.
Number three, Councilman Marinero. >> Mr. Supervisor, we authorize to advertise for bids for construction of the Route 52 commercial sidewalk district. >> Thank you, Councilman. Do I have a second? >> Second. >> Um, discussion. So, um, we have been discussing this. We received a New York State grant for sidewalks on Route 52 for almost 1.8 million, I…
Town Board Special Voting Meeting And Workshop
Board meeting · May 7, 2026
RFP published
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalProposals due (9 days left)
Town of East Fishkill Town Board Meeting Minutes
Board meeting · Jan 16, 2025
Adjacent opportunities open for bidding right now.
CityCA
Posted
Oct 28, 2026
Nov 18, 2026
Construction of the pedestrian intersection improvements and pavement rehabilitation.
CityAL
Posted
Sep 24, 2026
Nov 12, 2026
Traffic signals, curbing and roadway widening.
Indiana Department of Transportation
State AgencyIN
Posted
Oct 7, 2026
Nov 5, 2026
Work includes approx 3,996 SY of pavement removal; 4,647 SY of milling, asphalt, 2"; 4,928 LF of joint adhesive; 1,298 LF of guardrail removal; 63 LF of guardrail, mgs w-beam, 6' 3" spacing; 150 LF of fence, chain link, 96"; 86 SY of sidewalk, concrete; 350 LF of curb and gutter, concrete, type b; 1,252 SY of mulched seeding, type u and associated works.
CityAL
Posted
Sep 24, 2026
Nov 12, 2026
Traffic signals, curbing and roadway widening.