Closing soon

RSSP Unit 1 Fence Security Installation (Request for Qualifications)

Description: DESIGN-BUILD. The project will provide exterior perimeter security fence and gates design, and outdoor lighting to the residence halls. These are new fences and gates, that will relate to existing fence designs at Units 2 and 3 Housing Units. Gates to meet accessibility requirements. The university anticipates the project delivery method will be design/bid/build. The selected firm shall work collaboratively with the university to maintain the project budget and scope, participate in value engineering as required, and recommend actions to expedite the schedule. A detailed scope of work will be negotiated with the selected firm and is expected to include the following: review of existing available information. Development of comprehensive design information to identify and coordinate and life-safety scope with the existing building systems, and in compliance with university of california berkeley design requirements and standards. Identification of accessibility-related scope, including but not limited to accessible path of travel requirements for alterations, and accessible routes. Production of and coordination of comprehensive construction design documents. Submittal to, and approval from, the design review committee. Provision of construction administration services.

Buyer
University Of California Berkeley

HigherEducation · CA, US

Released
Jul 24, 2026
Closes
Aug 17, 2026(3 days left)

Files

Original attachments and procurement documents tied to this bid.

See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts