CityMI
Posted
-
Sep 15, 2026
Downtown Midland Lot D Reconstruction and Lift Station Drive
Work includes 2,938 SY remove bituminous pavement; 135 LF remove curb; 2,938 SY fine grading; 150 ton 22a aggregate base; 3 EA regrade structure; 330 ton bit leveling course, mdot 4eml; 190 SY remove bituminous pavement; 190 SY fine grading. See outside link.