Fremont Southeast Detention Basin - Grading Package
Posted
Aug 31, 2026
Sep 29, 2026
Grading for future stormwater detention cell. Description: 1 LS of mobilization; 1 LS of bonding and insurance; 1 LS of clearing and grubbing; 30203 CY of topsoil stripping, hauled off-site (established quantity); 167451 CY of excavation, hauled off-site (cut, established quantity); 1302 CY of earthwork, measured in embankment, on-site (fill, established quantity); 31 acre of seeding and hydromulch; 3 EA of stabilized construction entrance.