Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The proposed project includes 11,548 SY of full depth reclamation, 13,851 SY 6” PCC pavement for shared use path, 135 LF of storm sewer pipe (12" to 24"), 97 SY of 8” PCC Pavement, 333.6 STA of shoulder finishing for shared use path, traffic control, and erosion control. Bridge repair items include 12,556 LB of reinforcing steel, 4,400 LB of structural steel, 3.02 MFBM of treated timber and lumber, 114 tons of Class E revetment, 572 LF of vinyl coated chain link fence, 3 EA of Type A timber pipe repair, 6 EA of Type B timber pile repair, 53.8 CY of structural concrete, and 1,619 SF of 1.5” galvanized steel decking and other miscellaneous work.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
BID SCHEDULE PHASE 2: Consists of constructing the prestressed concrete girder bridge, asphalt roadway and sidewalk connecting to existing Phase 1 of Park Ave (to the south) Park Ave southern waterline extension and concrete trail. All tree removal is included in Phase 2.
Posted Date
Dec 12, 2025
Due Date
Jan 9, 2026
Release: Dec 12, 2025
Close: Jan 9, 2026
BID SCHEDULE PHASE 2: Consists of constructing the prestressed concrete girder bridge, asphalt roadway and sidewalk connecting to existing Phase 1 of Park Ave (to the south) Park Ave southern waterline extension and concrete trail. All tree removal is included in Phase 2.
AvailableRelease: Dec 2, 2025
Close: Dec 23, 2025
Bridge rehabilitation project.
The City of Santa Ana seeks bids for the Grand Avenue Rehabilitation project, which includes reconstruction and resurfacing of asphalt concrete pavement, sidewalk, curb and gutter repairs, and traffic improvements between Edinger Avenue and McFadden Avenue. The work includes removal and replacement of manhole frames/covers, water meter boxes, traffic signal pull boxes, adjustment of survey monuments, and installation of pavement, striping, and traffic loops; the project requires a California Class A General Contractors license. The estimated project value is approximately $1,281,000 and the expected project duration is 45 working days.
Posted Date
Dec 15, 2025
Due Date
Jan 9, 2026
Release: Dec 15, 2025
Close: Jan 9, 2026
The City of Santa Ana seeks bids for the Grand Avenue Rehabilitation project, which includes reconstruction and resurfacing of asphalt concrete pavement, sidewalk, curb and gutter repairs, and traffic improvements between Edinger Avenue and McFadden Avenue. The work includes removal and replacement of manhole frames/covers, water meter boxes, traffic signal pull boxes, adjustment of survey monuments, and installation of pavement, striping, and traffic loops; the project requires a California Class A General Contractors license. The estimated project value is approximately $1,281,000 and the expected project duration is 45 working days.
The City of Santa Ana seeks bids for the Grand Avenue Rehabilitation project, which includes reconstruction and resurfacing of asphalt concrete pavement, sidewalk, curb and gutter repairs, and traffic improvements between Edinger Avenue and McFadden Avenue. The work includes removal and replacement of manhole frames/covers, water meter boxes, traffic signal pull boxes, adjustment of survey monuments, and installation of pavement, striping, and traffic loops; the project requires a California Class A General Contractors license. The estimated project value is approximately $1,281,000 and the expected project duration is 45 working days.
Posted Date
Dec 15, 2025
Due Date
Jan 9, 2026
Release: Dec 15, 2025
Close: Jan 9, 2026
The City of Santa Ana seeks bids for the Grand Avenue Rehabilitation project, which includes reconstruction and resurfacing of asphalt concrete pavement, sidewalk, curb and gutter repairs, and traffic improvements between Edinger Avenue and McFadden Avenue. The work includes removal and replacement of manhole frames/covers, water meter boxes, traffic signal pull boxes, adjustment of survey monuments, and installation of pavement, striping, and traffic loops; the project requires a California Class A General Contractors license. The estimated project value is approximately $1,281,000 and the expected project duration is 45 working days.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.