Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
BID SCHEDULE PHASE 2: Consists of constructing the prestressed concrete girder bridge, asphalt roadway and sidewalk connecting to existing Phase 1 of Park Ave (to the south) Park Ave southern waterline extension and concrete trail. All tree removal is included in Phase 2.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Provide consulting services for the pennsylvania avenue extension bridging study.
Posted Date
Nov 4, 2025
Due Date
Dec 19, 2025
Release: Nov 4, 2025
Close: Dec 19, 2025
Provide consulting services for the pennsylvania avenue extension bridging study.
AvailablePremium
Access the largest public sector contact database
Work consists of the construction of the bridge includes bridge construction, roadway reconstruction, erosion control and protection, utility relocation of existing storm sewers, earth excavation and embankment, storm sewers, pavements, pavement marking and signage, roadway lighting, traffic signals, ITS, traffic control and protection urban enhancements. See outside link.
Posted Date
Dec 9, 2025
Due Date
Jan 16, 2026
Release: Dec 9, 2025
Close: Jan 16, 2026
Work consists of the construction of the bridge includes bridge construction, roadway reconstruction, erosion control and protection, utility relocation of existing storm sewers, earth excavation and embankment, storm sewers, pavements, pavement marking and signage, roadway lighting, traffic signals, ITS, traffic control and protection urban enhancements. See outside link.
AvailableThe City of Chico is soliciting bids to remove and replace the Pomona Avenue Bridge over Little Chico Creek, including construction of a new cast-in-place concrete bridge, replacement of an existing sewer siphon, drainage improvements, pavement, curb/gutter/sidewalk, retaining walls, and signing/striping. The Engineer's Estimate is approximately $4.8 million and the project is funded with Federal Highway Bridge Program funds. A virtual non-mandatory pre-bid outreach meeting is scheduled for 2025-12-17; bids are required to include a bid security equal to at least 10% of the total bid.
Posted Date
Dec 3, 2025
Due Date
Jan 15, 2026
Release: Dec 3, 2025
Close: Jan 15, 2026
The City of Chico is soliciting bids to remove and replace the Pomona Avenue Bridge over Little Chico Creek, including construction of a new cast-in-place concrete bridge, replacement of an existing sewer siphon, drainage improvements, pavement, curb/gutter/sidewalk, retaining walls, and signing/striping. The Engineer's Estimate is approximately $4.8 million and the project is funded with Federal Highway Bridge Program funds. A virtual non-mandatory pre-bid outreach meeting is scheduled for 2025-12-17; bids are required to include a bid security equal to at least 10% of the total bid.
AvailableWork includes covered bridge road water main extension project.
Posted Date
Nov 19, 2025
Due Date
Dec 18, 2025
Release: Nov 19, 2025
Close: Dec 18, 2025
Work includes covered bridge road water main extension project.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis