Higher EducationNY
Posted
Sep 1, 2026
Oct 9, 2026
SBU/ RRAMP LAB (Interior Fit Out, Elevator and Structural Package)
This Invitation for Bid seeks a qualified contractor for selective demolition of existing squash courts and the interior fit-out, structural upgrades, and new elevator for the Rehabilitation Research and Movement Performance Laboratory at Stony Brook University. The work includes all required labor, materials, equipment, and services, with a performance period of up to 609 days after award and compliance requirements covering prevailing wages, OSHA 10-hour safety certification, MWBE participation, recycling, and vendor responsibility. A mandatory pre-bid conference and site visit are scheduled for September 16, 2026, and bids are due October 9, 2026 at 12:00 PM EDT; this is a construction procurement rather than a grant program.