CityMI
Posted
Oct 21, 2026
Nov 5, 2026
Water Treatment Plant Boiler RFP
Seeking for a new boiler System include removal of old boiler system and meet the below specifications. Required Equipment with installation. Weil-McLain Model GV90+3 Series 2 Amtrol EX-30 Pro Inline 4.4gal Expansion Tank White Rodgers 1127-2 Strap-On Aquastat Caleffi 551028A 1" Sweat air separator.
