Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes approx. 1,960 CY of excavation; 5,000 SY of fine grading and compacting; 4,670 LF of 8" DI water pipe; 2,100 LF of 1" plastic water pipe; 20 LF of 8" water pipe insulation; 9 EA of hydrant; 75 EA of curb stop; 12,800 SY of pavement fine milling; 2,450 TN of HMA patching; 9,500 LF of HMA joint adhesive; 35 LF of cube removed and reset; 35 SY of cement pedestrian curb ramp; 250 SY of seeding; 9,500 LF of 6" pavement markings.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Waterline upgrades.
Posted Date
Oct 21, 2025
Due Date
Feb 2, 2026
Release: Oct 21, 2025
Close: Feb 2, 2026
Waterline upgrades.
AvailableThe Town of Bristol, Vermont seeks sealed bids for the Bristol West Waterline Replacement Project, a multi‑street upgrade to replace aging water mains and appurtenances. The project involves approximately 9,600‑9,650 feet of waterline replacement within Bristol, VT, with a pre‑bid/site visit scheduled for January 22, 2026. Bids are due February 12, 2026 at 1:00 PM local time.
Posted Date
-
Due Date
Feb 12, 2026
Close: Feb 12, 2026
The Town of Bristol, Vermont seeks sealed bids for the Bristol West Waterline Replacement Project, a multi‑street upgrade to replace aging water mains and appurtenances. The project involves approximately 9,600‑9,650 feet of waterline replacement within Bristol, VT, with a pre‑bid/site visit scheduled for January 22, 2026. Bids are due February 12, 2026 at 1:00 PM local time.
AvailableWork consists of installing approx 538 LF of 8" C-900 PVC waterline including fire hydrant, new water services and required fittings. The work includes installing concrete and concrete removal during the work.
Posted Date
Jan 16, 2026
Due Date
Feb 4, 2026
Release: Jan 16, 2026
Close: Feb 4, 2026
Work consists of installing approx 538 LF of 8" C-900 PVC waterline including fire hydrant, new water services and required fittings. The work includes installing concrete and concrete removal during the work.
AvailableProject consist of approx 3,500 LF of 12" PVC Waterline; 28 EA of 3/4" water service lateral long side; 2,065 TON of imported backfill material; 555 TON of 4" thick Hot mix asphalt.
Posted Date
Jan 21, 2026
Due Date
Feb 4, 2026
Release: Jan 21, 2026
Close: Feb 4, 2026
Project consist of approx 3,500 LF of 12" PVC Waterline; 28 EA of 3/4" water service lateral long side; 2,065 TON of imported backfill material; 555 TON of 4" thick Hot mix asphalt.