Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Lake Arrowhead Community Services District
Work consists of waterline replacement, includes install approx 2,650 LF of HDPE IPS DR 11 potable waterline (1,200 LF of 10", 900 LF of 8" and 550 LF of 6"). Including thirteen (13) 1" service lines, and five (5) fire hydrant assemblies.
Posted Date
Mar 12, 2026
Due Date
Apr 14, 2026
Release: Mar 12, 2026
Lake Arrowhead Community Services District
Close: Apr 14, 2026
Work consists of waterline replacement, includes install approx 2,650 LF of HDPE IPS DR 11 potable waterline (1,200 LF of 10", 900 LF of 8" and 550 LF of 6"). Including thirteen (13) 1" service lines, and five (5) fire hydrant assemblies.
AvailableLake Arrowhead Community Services District
Well no. 9 equipping, booster station, and reservoir construction. Scope of work includes - site Work; including: grading; 4" A.C. paving (4,800 SF) placed over 6" (min.) Class II base, including fog seal and redwood header; tree stump removal; 6'-0" high chain link fencing, access gate and 16'-0" wide double gate; 3' wide concrete cross gutter, wellhead enclosure vault and concrete, 2"/4" stainless steel piping from wellhead to treatment, 4" stainless steel piping from treatment to reservoir, and 6" PVC piping from reservoir to booster pumps; see attached file.
Posted Date
Mar 12, 2026
Due Date
Apr 14, 2026
Release: Mar 12, 2026
Lake Arrowhead Community Services District
Close: Apr 14, 2026
Well no. 9 equipping, booster station, and reservoir construction. Scope of work includes - site Work; including: grading; 4" A.C. paving (4,800 SF) placed over 6" (min.) Class II base, including fog seal and redwood header; tree stump removal; 6'-0" high chain link fencing, access gate and 16'-0" wide double gate; 3' wide concrete cross gutter, wellhead enclosure vault and concrete, 2"/4" stainless steel piping from wellhead to treatment, 4" stainless steel piping from treatment to reservoir, and 6" PVC piping from reservoir to booster pumps; see attached file.
AvailableLake Arrowhead Community Services District
Work consists of supplying the major mechanical equipment to be included in the wwps 11 pre-engineered pump station procurement project.
Posted Date
-
Due Date
Mar 12, 2026
Lake Arrowhead Community Services District
Close: Mar 12, 2026
Work consists of supplying the major mechanical equipment to be included in the wwps 11 pre-engineered pump station procurement project.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from Lake Arrowhead Community Services District
The Executive Committee Agenda for February 17, 2026, includes review and approval of the January 20, 2026, Executive Committee Meeting Minutes. Discussion topics slated for this meeting are Future Meeting Agenda Review, the ALA LACSD Interface Committee Meeting, and General Manager's Comments on various District issues. The associated minutes from the January 20, 2026 meeting detailed discussions on the upcoming board agenda, including the presentation of 4th Quarter reports, a 6% decrease in water delivered, the lowest potable water usage since the 1970s, and updates on the PFAS plan approval process. Action items from the January meeting included nominations for the Local Agency Formation Commission (LAFCO) and the adoption of the Updated Sewer System Management Plan (SSMP).
The committee discussed the upcoming board meeting agenda, which includes the appointment of a new Division #5 Board Director and recognition of an employee's retirement. The committee reviewed consent items such as water transfers and the acceptance of several infrastructure projects, including sewer and water tank site stabilizations. Additionally, the committee received updates on the financial statements, budget planning, operations, and various grant opportunities, including those for cybersecurity and water system improvements. Updates were provided on the PFAS treatment project, solar panel installation, committee vacancy designations, and the California Special Districts Association board seat.
The board agenda includes several key items, such as the declaration of surplus property for the administration, mechanical maintenance, and engineering departments. The General Manager's report covers updates on the PFAS removal project, progress on Rimforest water system improvements, solar project timelines, the Two Mile groundwater well project, and an outreach campaign regarding the spread of invasive golden mussels. Additionally, the board is scheduled to consider awarding a contract for the Sewer Lift Station #11 engineering pump station procurement project and will convene for a closed session regarding real property negotiations.
The agenda for the committee meeting includes a public comment period and the approval of the March 27, 2024, meeting minutes. Key discussion topics planned for the meeting are Lake Level status, PFAS contamination, the Golden Mussel issue, Dredging, an update on the Valve Outlet Tower, and consideration of future agenda topics.
The agenda for the Regular Meeting of the Board of Directors includes consideration for appointing a Board Member to Division #5, special recognition of a retiring employee, Scott Schroder, and a review of the FY 2025-26 Financial Statements and Cash and Investment Report for the quarter ended December 31, 2025. The consent calendar covers the approval of minutes from the January 27, 2026 meeting and accepting several capital projects as complete: Hospital Road Sewer Replacement Project No. 256, Manhole Inflow Reduction 2025-26 Project No. 270, Spyglass Water Tank Site Slope Stabilization Project No. 179, and the Operations Building at the Willow Creek Wastewater Treatment Plant Project No. 255. Other discussion items include budget planning for FY 2026-27 and 2027-28, and an update on PFAS treatment design. An action item addresses the designation of one alternate to the Arrowhead Lake Association and Lake Arrowhead Community Services District Interface Committee. Materials also cover the proposed temporary transfer of the 2024/2025 Carryover Right from the District's Free Production Allowance.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Lake Arrowhead Community Services District's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database