Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The project consists of constructing improvements at the intersection of Route 234 (Prince William Parkway) at Drive and includes modifications to the intersection of Parkway and Road. The project will construct an interchange at Parkway and Drive to maintain free-flow traffic on Parkway. The project will grade separate Parkway and Road. The approved Innovation Town Center includes proffered improvements to construct a signal at Road, as well as realign Road. New signals are being proposed as part of the overall interchange design. The project will increase capacity and reduce congestion along this important corridor.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Designs will include interchange ramps at the Fifth Street interchange in Pocatello to meet current standards, improve safety and allow for compatibility with future bridge and interstate improvements. Services include: Alternatives analysis; value planning study; environmental and public involvement support services; geotechnical and materials report; supplemental survey services; utility coordination; roadway design; drainage analysis and design; traffic engineering; illumination design; retaining wall design; landscape and irrigation design; and construction phase services.
Posted Date
Jan 8, 2026
Due Date
Jan 30, 2026
Release: Jan 8, 2026
Close: Jan 30, 2026
Designs will include interchange ramps at the Fifth Street interchange in Pocatello to meet current standards, improve safety and allow for compatibility with future bridge and interstate improvements. Services include: Alternatives analysis; value planning study; environmental and public involvement support services; geotechnical and materials report; supplemental survey services; utility coordination; roadway design; drainage analysis and design; traffic engineering; illumination design; retaining wall design; landscape and irrigation design; and construction phase services.
AvailableThe County of Santa Cruz (Department of Community Development and Infrastructure / Public Works - Roads) issued an RFP seeking a consultant to provide project management services for the Soquel Drive Multimodal Project, a roughly 2.4-mile corridor improvement to enhance pedestrian and bicycle safety, accessibility, and traffic operations. The selected consultant will perform project management tasks including CPM scheduling, progress reporting, Caltrans coordination for federal-aid compliance, environmental permitting oversight, procurement scopes, and construction-phase oversight with an expected contract term up to 36 months. Proposals are to be submitted electronically through the county's OpenGov procurement portal by the posted deadline; the solicitation is an RFP (not a grant) and was open as of 2026-01-06.
Posted Date
Jan 5, 2026
Due Date
Feb 6, 2026
Release: Jan 5, 2026
Close: Feb 6, 2026
To provide a project design to expand broadband middle-mile infrastructure. See attached file.
Posted Date
Nov 18, 2025
Due Date
Mar 4, 2026
Release: Nov 18, 2025
Close: Mar 4, 2026
To provide a project design to expand broadband middle-mile infrastructure. See attached file.
AvailableQualified ecological restoration and landscape vendors to provide invasive woody species removal, site preparation, and installation of native trees, shrubs, and ground cover within the public parkway.
Posted Date
Jan 13, 2026
Due Date
Feb 2, 2026
Release: Jan 13, 2026
Close: Feb 2, 2026
Qualified ecological restoration and landscape vendors to provide invasive woody species removal, site preparation, and installation of native trees, shrubs, and ground cover within the public parkway.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The County of Santa Cruz (Department of Community Development and Infrastructure / Public Works - Roads) issued an RFP seeking a consultant to provide project management services for the Soquel Drive Multimodal Project, a roughly 2.4-mile corridor improvement to enhance pedestrian and bicycle safety, accessibility, and traffic operations. The selected consultant will perform project management tasks including CPM scheduling, progress reporting, Caltrans coordination for federal-aid compliance, environmental permitting oversight, procurement scopes, and construction-phase oversight with an expected contract term up to 36 months. Proposals are to be submitted electronically through the county's OpenGov procurement portal by the posted deadline; the solicitation is an RFP (not a grant) and was open as of 2026-01-06.
Available