Special DistrictPA
Posted
Nov 4, 2026
Dec 8, 2026
ARV Replacements on Arterial Transmission Mains, Phase 2 RFP
ARV Replacements on Arterial Transmission Mains, Phase 2.
Description: Summary: For more details on this RFP and how to submit a proposal, please refer to the full bid documents.
City · BC, CA
Solicitation files and supporting documents for this bid.
Adjacent opportunities open for bidding right now.
Special DistrictPA
Posted
Nov 4, 2026
Dec 8, 2026
ARV Replacements on Arterial Transmission Mains, Phase 2.
CityWI
Posted
Oct 22, 2026
Dec 9, 2026
Spillway replacement and other improvements at the Dam. Major project components include construction dewatering, earth moving, cast-in-place concrete, pre-cast concrete, steel sheet piling, a hydraulically operated crest gate, piping, electrical work, pavements, and other site improvements.
Special DistrictIN
Posted
Oct 8, 2026
Dec 15, 2026
Replace wooden transmission poles with new steel poles, and replace wood distribution poles, including the transfer of existing 69kV conductors, 13.2kV underbuild conductors and associated distribution facilities.
Posted
Nov 16, 2026
Dec 4, 2026
The total replacement of the transmissions in two (2) of their facility owned vans.
Decision makers connected to this RFP from West Kelowna.