Description: Spillway replacement and other improvements at the Dam. Major project components include construction dewatering, earth moving, cast-in-place concrete, pre-cast concrete, steel sheet piling, a hydraulically operated crest gate, piping, electrical work, pavements, and other site improvements.
City · WI, US
From the first pre-RFP signals to the published RFP and its files.
Board meeting
485 days before RFP
The Common Council approved Resolution No. 9 authorizing up to $6,990,000 in notes for capital improvements including the Mill Pond Dam.
B. No 9. -- Resolution Authorizing The Issuance and Sale of not to Exceed $6,990,000 General Obligation Promissory Notes, Series 2025A-- Blakeslee explained that as part of the 2025 Capital Improvement Plan, the City intends to issue debt for the Mill Pond Dam, Collins Street Reconstruction, and the Electric storage Building. Boening from Ehlers gave a…
City of Plymouth, Wisconsin Common Council Meeting
Board meeting · Jun 24, 2025
Board meeting
322 days before RFP
The City Administrator proposed a temporary construction easement for Mill Pond Dam access and equipment laydown on parcel 59271820350.
DATE: December 4, 2025 TO: Mayor and Common Council FROM: Tim Blakeslee, City Administrator/Utilities Manager RE: Approve Temporary Construction Limited Easement with Parcel 59271820350 Background: It is currently anticipated that the Mill Pond Dam project will take place in 2026. As part of that work, several temporary easements are needed to support…
City Of Plymouth Common Council Meeting
Board meeting · Dec 4, 2025
Board meeting
86 days before RFP
The Common Council approved a $98,000 amendment for final design, bidding, and construction inspection, with bidding corrected to Fall 2026.
C. Discussion and Possible Approval of Amendment to Engineering Services Agreement with Ayre Associates for Mill Pond Dam Replacement Project-- City Administrator / Utilities Manager Tim Blakeslee explained that in February 2025, an update was provided regarding project schedule and in April 2025 an update was provided on final design and cost. In May of…
RFP published
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalProposals due (27 days left)
City of Plymouth Common Council Common Council Meeting
Board meeting · Jul 28, 2026
Adjacent opportunities open for bidding right now.
Monrovia Unified School District
School DistrictCA
Posted
Oct 5, 2026
Nov 5, 2026
Elementary school fire alarm system replacement.
FederalCO
Posted
Oct 12, 2026
Nov 11, 2026
Removal of the existing failed HVAC system and installation of a replacement system consisting of either one 12.5 ton HVAC unit or a comparable commercial-grade HVAC system.
Posted
Oct 14, 2026
Nov 12, 2026
Project includes the installation, maintenance, and removal of erosion and sediment control measures. Installation, implementation, and coordination of traffic control plan, and removal at completion of construction. Stripping and stockpiling topsoil. Demolition of existing concrete dam and associated infrastructure. Control of surface water and dewatering of subgrades in areas of work. Excavation and placement of select fill, topsoil and seeding.
Fayetteville Public Works Commission
Special DistrictNC
Posted
Oct 2, 2026
Nov 19, 2026
The Tree Removal, Parapet Wall Repair, and Piezometer Replacement at Dam includes repair of cracks in the parapet wall, removal of identified trees and vegetation, and replacement of piezometers used for monitoring at the dam.