Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes demolition of existing roofing systems and metal awning roof; installation of new epdm and standing seam metal roof, including rigid insulation, cover board and metal flashing accessories; installation of all flashing products required for roof top penetrations; removal existing roof drains and installation of new roof drains; replacement of existing rooftop ducts in-kind. New ducts are to be insulated and wrapped in an exterior weather barrier; installation of new duct curbs and conduit supports; installation of new metal awning roof; paint concrete awning at front entrance at front, side and underside.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Replace the roof systems of the Smith Memorial Student Union (SMSU) building. Perform complete tear off of the existing roof systems and install a new contiguous system and maintenance support devices. Work includes roof top safety infrastructures.
Posted Date
Dec 29, 2025
Due Date
Feb 4, 2026
Release: Dec 29, 2025
Close: Feb 4, 2026
Replace the roof systems of the Smith Memorial Student Union (SMSU) building. Perform complete tear off of the existing roof systems and install a new contiguous system and maintenance support devices. Work includes roof top safety infrastructures.
Available2026 roof replacement.
Posted Date
-
Due Date
Jan 22, 2026
Release: -
Close: Jan 22, 2026
2026 roof replacement.
AvailableClose: Jan 30, 2026
Roof replacement.
AvailableReplacement of cooling towers number 1 and 2 at the central plant (building 11).
Posted Date
Dec 18, 2025
Due Date
Feb 3, 2026
Release: Dec 18, 2025
Close: Feb 3, 2026
Replacement of cooling towers number 1 and 2 at the central plant (building 11).
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis