Posted
Sep 14, 2026
Sep 21, 2026
Fire Station 3 Roof Replacement RFP
Work consist of removal of existing roof down to the existing medat deck and replace with new roof.
Description: The Town of Manchester is soliciting sealed bids for the ROOF REPLACEMENT AT FIRE STATION #3 construction project. The work includes removing approximately 7,100 square feet of existing ballasted built-up roofing and installing a new EPDM membrane roofing system, along with related decking, drains, flashings, coping, fascia, and scuppers. This is an Invitation To Bid rather than a grant program; a non-mandatory pre-bid meeting is scheduled for August 13, 2026, and bids are due August 27, 2026, at 1:00 p.m. Eastern Time.
City · CT, US
Original attachments and procurement documents tied to this bid.
These related opportunities are still open for bidding.
Posted
Sep 14, 2026
Sep 21, 2026
Work consist of removal of existing roof down to the existing medat deck and replace with new roof.
CityUT
Posted
Sep 1, 2026
Sep 21, 2026
Work consists of fire station roof replacement. The project generally consists of removing and replacing the existing roofing membrane. The work also includes removal and replacement of insulation as necessary to provide a nominal slope of 1/4" per foot toward the roof drains, clearing and testing the existing roof drains, and repairing identified soft spots and areas damaged by water infiltration. Removal and replacement of the existing aluminum cap flashing will be included as an additive alternate.
CityNY
Posted
Sep 14, 2026
Oct 7, 2026
Transfer station roof replacement.
CityMA
Posted
Sep 16, 2026
Oct 6, 2026
Roof at fire station.
Decision makers connected to this RFP from Town of Manchester.