Ohio Facilities Construction Commission
State AgencyOH
Aug 4, 2026
Closes
Aug 18, 2026
RCI Roof and Fence - Roof Replacement
Provide a correctional facility roofing and fencing project involving roof improvements and fence repairs.
Description: The Texas Military Department is soliciting turnkey roof replacement work for Buildings 26, 45, 64, and 64A including removal of existing shingles, replacement of damaged decking and fascia, installation of synthetic underlayment, new drip edges, flashing, pipe boots, and 30-year three-tab asphalt shingles. The procurement is an Invitation for Bid (Solicitation ID TMD26-FMO-0043405) with attachments including the IFB solicitation document, mandatory pricing sheet, and department terms and conditions; mandatory site visit and pre-bid meeting are scheduled for 08/20/2026. Responses are due 08/27/2026 at 2:00 PM and contact for the solicitation is Brent Morgan, brent.morgan@military.texas.gov.
StateAgency · TX, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
Ohio Facilities Construction Commission
State AgencyOH
Aug 4, 2026
Closes
Aug 18, 2026
Provide a correctional facility roofing and fencing project involving roof improvements and fence repairs.
CityMO
Aug 5, 2026
Closes
Aug 26, 2026
The City of Wentzville is seeking qualified contractors to replace the roof at the Wentzville Rec Center. The Invitation for Bid includes a mandatory pre-bid meeting, electronic registration, and electronic bid submission. Bids are due August 26, 2026, at 2:00 p.m. Central Time, and the solicitation is an active construction procurement rather than a grant program.
CityMA
Jul 20, 2026
Closes
Aug 20, 2026
Replace the roofs on three (3) structures owned by the town.
Carter County Sheriff's Office
Police DepartmentKY
Jul 29, 2026
Closes
Aug 28, 2026
Roof Replacement, includes: 1. Clean and prep the existing roof membrane for roof replacement. 2. Remove the existing roof membrane from all roof walls, curbs, and roof penetrations. 3. Install a fully adhered rubber system, or comparable metal gauge standing seam roof system, in accordance with standard specification details. 4. Installation bids should include flashing of all roof penetrations in a watertight manner, fabrication and installation of gravel stop and drip edges at all required locations, and removal of project debris from site.
Procurement and program contacts connected to Texas Military Department.