CityMO
Posted
Oct 20, 2026
Nov 20, 2026
Annual Lift Station Pump Rebuilds Replacements 2027 RFP
To remove up to five (5) existing submersible wastewater pumps and seven (7) existing above ground pumps and motors for inspection and evaluation by the pump manufacturer’s area representative(s). Those pumps/motors found to be in adequate condition for repair will be refurbished and placed back in service. Those pumps/motors found not to be in adequate condition for refurbishment will be replaced based on the lowest and best bid for each application as provided in this RFB.
