Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This solicitation, issued by Gaston College, is for the Robinson Classroom Building Boiler Replacement with Electrical and Ductwork Upgrades (ARPA Funded). The project involves replacing existing mechanical equipment and upgrading electrical systems and ductwork. The work is expected to be completed by December 31, 2026, within 182 consecutive calendar days from the Notice to Proceed.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Municipal building boiler replacement. Modification of existing steam, make-up water and gas piping to new boiler, new vent connection to the existing chimney, and reconnection of boiler power supply.
Posted Date
-
Due Date
Jan 28, 2026
Close: Jan 28, 2026
Municipal building boiler replacement. Modification of existing steam, make-up water and gas piping to new boiler, new vent connection to the existing chimney, and reconnection of boiler power supply.
AvailableBoiler Upgrades at Elementary School.
Posted Date
Dec 18, 2025
Due Date
Feb 4, 2026
Release: Dec 18, 2025
Close: Feb 4, 2026
Boiler Upgrades at Elementary School.
AvailableWork include new electrical panels, conduit and wiring runs, and a some new transformers.
Posted Date
Dec 10, 2025
Due Date
Jan 28, 2026
Release: Dec 10, 2025
Close: Jan 28, 2026
Work include new electrical panels, conduit and wiring runs, and a some new transformers.
AvailableThe project consists of the removal and replacement of the condensing boilers serving the Event Center Building. (4) existing condensing boilers are to be removed and replaced with (3) 5000 MBH boilers and (1) 2000 MBH boiler. Existing boiler pumps, system pumps, expansion tanks, and air separators are to be removed and replaced. Temperature controls to be updated to serve this new equipment.
Posted Date
Jan 9, 2026
Due Date
Jan 29, 2026
Release: Jan 9, 2026
Close: Jan 29, 2026
The project consists of the removal and replacement of the condensing boilers serving the Event Center Building. (4) existing condensing boilers are to be removed and replaced with (3) 5000 MBH boilers and (1) 2000 MBH boiler. Existing boiler pumps, system pumps, expansion tanks, and air separators are to be removed and replaced. Temperature controls to be updated to serve this new equipment.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis