Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Municipal building boiler replacement. Modification of existing steam, make-up water and gas piping to new boiler, new vent connection to the existing chimney, and reconnection of boiler power supply.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Provide municipal building exterior trim replacement.
Posted Date
Jan 15, 2026
Due Date
Feb 11, 2026
Release: Jan 15, 2026
Close: Feb 11, 2026
Provide municipal building exterior trim replacement.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The project consists of the removal and replacement of the condensing boilers serving the Event Center Building. (4) existing condensing boilers are to be removed and replaced with (3) 5000 MBH boilers and (1) 2000 MBH boiler. Existing boiler pumps, system pumps, expansion tanks, and air separators are to be removed and replaced. Temperature controls to be updated to serve this new equipment.
Posted Date
Jan 9, 2026
Due Date
Jan 29, 2026
Release: Jan 9, 2026
Close: Jan 29, 2026
The project consists of the removal and replacement of the condensing boilers serving the Event Center Building. (4) existing condensing boilers are to be removed and replaced with (3) 5000 MBH boilers and (1) 2000 MBH boiler. Existing boiler pumps, system pumps, expansion tanks, and air separators are to be removed and replaced. Temperature controls to be updated to serve this new equipment.
AvailableBoiler replacement.
Posted Date
Jan 5, 2026
Due Date
Feb 4, 2026
Release: Jan 5, 2026
Close: Feb 4, 2026
Boiler replacement.
AvailableBoiler replacement.
Posted Date
Aug 17, 2025
Due Date
Jan 27, 2026
Release: Aug 17, 2025
Close: Jan 27, 2026
Boiler replacement.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →