Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The project consists of the removal and replacement of the condensing boilers serving the Event Center Building. (4) existing condensing boilers are to be removed and replaced with (3) 5000 MBH boilers and (1) 2000 MBH boiler. Existing boiler pumps, system pumps, expansion tanks, and air separators are to be removed and replaced. Temperature controls to be updated to serve this new equipment.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Provide energy efficiency related facilities improvements.
Posted Date
Jan 5, 2026
Due Date
Feb 13, 2026
Release: Jan 5, 2026
Close: Feb 13, 2026
Provide energy efficiency related facilities improvements.
AvailableThe City and Borough of Juneau is seeking bids for the replacement of boilers at Juneau-Douglas High School. The project includes replacing existing oil-fired boilers and burners with new ones, installing boiler and burner controls, providing electrical work, and testing and balancing boiler flow equipment. The estimated cost of the project is between $1,000,000 and $1,250,000.
Posted Date
Dec 23, 2025
Due Date
Jan 20, 2026
Release: Dec 23, 2025
Close: Jan 20, 2026
The City and Borough of Juneau is seeking bids for the replacement of boilers at Juneau-Douglas High School. The project includes replacing existing oil-fired boilers and burners with new ones, installing boiler and burner controls, providing electrical work, and testing and balancing boiler flow equipment. The estimated cost of the project is between $1,000,000 and $1,250,000.
AvailableBoiler replacement at high school.
Posted Date
Dec 21, 2025
Due Date
Jan 16, 2026
Release: Dec 21, 2025
Close: Jan 16, 2026
Boiler replacement at high school.
AvailableReplace the boiler in Building 290. Repairs include replacement of the existing 1988 model year 336,000 BTU/h hot water boiler with a new high-efficiency condensing boiler. The project includes the installation of all associated boiler room copper piping, valves, 3-way valve, water treatment system, boiler controls, and the replacement of the existing pump and 2 HP pump motor.
Posted Date
Jan 2, 2026
Due Date
Jan 22, 2026
Release: Jan 2, 2026
Close: Jan 22, 2026
Replace the boiler in Building 290. Repairs include replacement of the existing 1988 model year 336,000 BTU/h hot water boiler with a new high-efficiency condensing boiler. The project includes the installation of all associated boiler room copper piping, valves, 3-way valve, water treatment system, boiler controls, and the replacement of the existing pump and 2 HP pump motor.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis