Colorado Department of Transportation
State AgencyCO
Posted
-
Jun 11, 2027
Region 1 - Striping Improvements RFP
Striping improvements on roadways in the region
Description: Work includes 7,515 Gal tack coat, superpave bituminous concrete wearing surface layer, 3/8" maximum aggregate size mix, esal range a/b 7,485 Ton, superpave bituminous concrete upper binder layer, widening, 1" maximum aggregate size mix, esal range a/b 3,857 Ton, 19 mile scoring bituminous pavement surface, 1,859 Ton aggregate surfacing (1" down, crusher run), mobilization, 100 LF wattle, 20", construction fuel, 19 mile solid yellow, class 2t, type a traffic stripe, 3 mile broken yellow, class 2t, type a traffic stripe, 19 mile solid white, class 2t, type a traffic stripe (5" wide), 160 SF traffic control markings, class 2t, type A. See attached file.
SpecialDistrict · AL, US
Original attachments and procurement documents tied to this bid.
Adjacent opportunities open for bidding right now.
Colorado Department of Transportation
State AgencyCO
Posted
-
Jun 11, 2027
Striping improvements on roadways in the region
Matagorda Waste Disposal and Water Supply Corporation
Special DistrictTX
Posted
Aug 21, 2026
Sep 25, 2026
Project includes, but is not limited to, construction of water system and roadway improvements for the waste disposal and water supply corporation including civil, mechanical, structural, electrical, and other project components.
CountyGA
Posted
-
Sep 21, 2026
Coweta County Government is seeking qualified firms to develop a Comprehensive Safety Action Plan under the federal Safe Streets and Roads for All (SS4A) initiative. The work includes crash-data analysis, GIS mapping, public outreach, coordination with county agencies, and draft, final, adoption, and final-report deliverables. This is a request-for-qualifications procurement for consulting services—not a grant program—with qualifications due September 21, 2026.
CityMA
Posted
Aug 31, 2026
Sep 17, 2026
Work consist of 130 cy of unclassified excavation, 10 cy of class b rock excavation , 4 ea of stump removed, 5,400' of shoulder millings, 1,200' of shoulder ballast, 680 sy of fine grading & compacting, 30 sy of hma waterway, 9,300 sy of reclaimed pavement for base course and/or subbase, 80 sy of pavement standard milling, 14,000 lb of calcium chloride for roadway dust control, 20 tn of hma for patching, 460 gal of asphalt emulsion for tack coat, 760 tn of superpave surface course, 1,000' of sawcutting asphalt pavement, 340' of guardrail, 4 ea of guardrail tangent end treatment, 170' of highway guard removed and discarded. See attached file.
Decision makers connected to this RFP from Alabama Department of Transportation.