CityPA
Aug 18, 2026
Closes
Aug 27, 2026
Cromwell Township Road Work RFP
Placement of estimated 210 tons of 2A at a depth of 4" to shape road between 4-6% and 320 Tons of Driving Surface Aggregate (DSA) on Peterson Road. DSA must have a paver-placed at a depth of 6" and compacted to 4" with a 10-ton vibratory roller. A minimum of a 4-person crew (preferred 5 person-crew) must be on site for placement: a driver, 2 persons on the screen, and one person on the roller. DSA must be placed at 18-19 feet wide; paver must have extension augers to be able to properly place DSA at width specified. DSA needs to be pulled in One pass.