CountyGA
Aug 17, 2026
Closes
Oct 8, 2026
Stewart Mill Road at Bermuda Road Roundabout (12 Months)
Work consist of 100 tn of recycled asphalt concrete patching, incl bituminous material & h lime, 190 tn of recycled asphalt concrete leveling, incl bituminous material & h lime, 320 tn of recycled asphalt concrete 12. 5 mm superpave, gp 2 only, incl bituminous material & h lime, 780 tn of recycled asphalt concrete 25 mm superpave, gp 1 or 2, incl bituminous material & h lime, 370 tn of recycled asphalt concrete 19 mm superpave, gp 1 or 2,incl bitum material & h lime, 53 tn of recycled asphalt concrete 12. 5 mm superpave, gp 2 only, incl polymer modified bituminous material & h lime, 110 sy of mill asphalt concrete pavement, 97 sy of driveway concrete. See attached file.