Summary
Sheridan Road Waterline Improvements Project Alignment: The new improvements route begins at the intersection of S Bridge Street and SE Hope Court and continues southeast along Sheridan Road to SE Hope Court. The new PVC pipe will be installed via open trench under the existing roadway and sidewalk. Water Distribution Improvements: The project scope includes all work and materials related to the construction of approx. 4,100 LF of new 14" PVC waterline, transitions sections of 4", 6" and 10" new waterline, and installation of waterline fittings and valving, fire hydrant assemblies, blow-off hydrant assembles, air release assembles, and 68 reconnections to existing water service piping. Waterline installation will require pipe bedding and backfill with compaction efforts, AC trench patching, and includes waterline and material testing and other miscellaneous items required for a complete installation. Sanitary Sewer Improvements: Approx. 4,000 LF of 8, 12, and 15" Cured in Place Pipe lining (CIPP) shall be installed along the project alignment. The project scope includes Furnishing all labor, equipment and materials as required for the complete installation of CIPP liner on the existing gravity sewer. Complete installation of the new facilities shall include, but not be limited to potholing and locating the existing sewer lines and laterals, interim construction of bypass pumping, installment of CIPP liner and landscape restoration and clean up.