Forbush Mill Road over Still River Proposed Bridge *RE-BID*
The work consists of the demolition of two existing HDPE pipe culverts and headwalls conveying the mill road over still river and constructing a precast concrete rigid frame bridge on spread footings with precast retaining walls. The work also includes restoring the stream, banks, and wetlands, removal and replacement of the existing roadway surface and existing guardrails. Bids shall be on a lump sum and unit price basis, as indicated in the bid form. This contract contains price adjustments for hot mix asphalt mixes, diesel fuel, gasoline, portland cement contained in concrete, and steel.