Retrieving RFP details
Release
Close
City of Montgomery
The scope of work involves furnishing all labor, materials, services, and equipment required to construct a 10 LF wide multi-use trail, approx 2,600 LF in length with 1050-tons of crushed aggregate base material and 180-sq yds of 4” thick concrete. The work also includes decorative lighting, a 4 LF tall retaining wall approximately 150 LF long, 420 LF of concrete curb, 210-ft of HDPE storm sewer pipe, 4 EA of grate inlets, 216 SY of 8" concrete driveway turnouts, 1044-LF of precast concrete safety dividers, 12-ea of removable steel bollards, 80-LF of railroad track rubber interface, 5-ea of landscaping trees, 2500-SY of solid sodding, and other miscellaneous items for construction including excavation and grading, minor clearing, traffic control, and erosion control.
Advertisement_Riverfront-Trail-Ext
Township of Haverford
Installation of approx. 1,000 LF of a 10-foot-wide bituminous trail, streambank stabilization along Creek and unnamed tributaries, and the replacement of two existing structures adjacent to Creek.
Bernalillo County
Provide construction services for road trail extension. The design requires the construction of an 8'-wide multi-use path and the installation of three pre-manufactured pedestrian bridges.
Village of Chama
Street water extension improvements.
Release
Oct 15, 2025
Close
Nov 13, 2025