Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Roadway & infrastructure improvements. Work includes full depth pavement reconstruction, installation of new cement concrete walk, resetting existing and new granite curb, new ADA pedestrian ramps, drainage upgrades including installation of new catch basin, drop inlet and manhole structures, installation of new modular or MSE retaining wall, signage, pavement markings and other incidental work.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Roadway Improvements consists, but not limited to all labor, material and equipment necessary or required to complete all proposed improvements. The project generally entails milling of existing asphalt roadway, new asphalt roadway, curbing, sidewalk, signage, striping and top soiling / hydro-seeding.
Posted Date
Jan 16, 2026
Due Date
Feb 4, 2026
Release: Jan 16, 2026
Close: Feb 4, 2026
Roadway Improvements consists, but not limited to all labor, material and equipment necessary or required to complete all proposed improvements. The project generally entails milling of existing asphalt roadway, new asphalt roadway, curbing, sidewalk, signage, striping and top soiling / hydro-seeding.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Seeking bids from qualified contractors for roadway and associated infrastructure improvements for its Moore Street and Valley Street Phase 1 Infrastructure Improvements. Project, which consists of removal and replacement of 475 LFof sewer main, manholes and laterals, 550 LF of water main, service connections, fire hydrants, gate valves, full depth road construction, and all associated work for Valley Street (east) and the northern portion of Moore Street.
Posted Date
Jan 7, 2026
Due Date
Jan 28, 2026
Release: Jan 7, 2026
Close: Jan 28, 2026
Seeking bids from qualified contractors for roadway and associated infrastructure improvements for its Moore Street and Valley Street Phase 1 Infrastructure Improvements. Project, which consists of removal and replacement of 475 LFof sewer main, manholes and laterals, 550 LF of water main, service connections, fire hydrants, gate valves, full depth road construction, and all associated work for Valley Street (east) and the northern portion of Moore Street.
AvailableRoadway reconstruction, installation of infiltration trenches, and associated work on street. Infiltration Trench – saw cut, excavate and dispose of excavated material, geotextile, AASHTO No. 3 aggregate, inlet, pipe, bends, cleanout, manhole cover, permanent inlet protection, PA 2A backfill above trench to road subbase, complete in place. Superpave Asphalt Mix, Binder Course, 19mm, PG 64S-22, 0.3 to < 30 million ESALs, 3" depth (240 Ton). Subbase Repair – excavate 8" depth, install class 4 geotextile, place and compact 8" depth AASHTO No. 1 stone, complete in-place (100 SY).
Posted Date
Jan 8, 2026
Due Date
Jan 27, 2026
Release: Jan 8, 2026
Close: Jan 27, 2026
Roadway reconstruction, installation of infiltration trenches, and associated work on street. Infiltration Trench – saw cut, excavate and dispose of excavated material, geotextile, AASHTO No. 3 aggregate, inlet, pipe, bends, cleanout, manhole cover, permanent inlet protection, PA 2A backfill above trench to road subbase, complete in place. Superpave Asphalt Mix, Binder Course, 19mm, PG 64S-22, 0.3 to < 30 million ESALs, 3" depth (240 Ton). Subbase Repair – excavate 8" depth, install class 4 geotextile, place and compact 8" depth AASHTO No. 1 stone, complete in-place (100 SY).
AvailableRoad reconstruction, milling, paving, concrete sidewalk, concrete driveway aprons, curb, installation of inlets and pipes, and site restoration.
Posted Date
Jan 12, 2026
Due Date
Jan 27, 2026
Release: Jan 12, 2026
Close: Jan 27, 2026
Road reconstruction, milling, paving, concrete sidewalk, concrete driveway aprons, curb, installation of inlets and pipes, and site restoration.