Washington Department of Fish and Wildlife
State AgencyWA
-
Closes
Sep 3, 2026
Ringold Raceway Installation
Construct two new raceways at the Department's Ringold Springs Hatchery. Work includes: Demolishing existing vinyl raceways and installing two new sets of raceways, distribution box and all associated and piping for both sites includes construct the distribution box and truck fill station. This shall include all utilities and appurtenances within five FT of the structure. Construct the concrete raceways, including the netted bird-predation system. This shall include all mechanical and structural items within five FT of the structure. Construct the concrete raceways. Install all site piping, trenching, valves, vaults, owner-furnished pollution abatement ponds and equipment. Provide site electrical and equipment, 200 LF install cure-in-place-pipe to repair 24" diameter corrugated metal pipes. Metal building: Design, construct and permit a hatchery structure and foundation. The contractor shall provide all required engineering and permits for the building and slab-on-grade foundation.