Summary
Work consist of site excavation, 150 lf of removal and disposal of existing curb & gutter, 25 sy of removal and disposal of existing asphalt pavement, 25 cy of unclassified excavation, 25 cy of borrow excavation, 3.3 tn of hot mix asphalt surface, 1 ea of catch basin, 210 lf of concrete curb/gutter 18", 85 sy of concrete sidewalk 4" uniform, 40 sf of detectable warning surface, 0.23 msy of seeding mulched, 230 sy of sod, 0.05 tn of fertilizer, 0.1 tn of lime, 5 lb of nitrogen, 222 lf of 24" solid white lines thermoplastic- 125 mil. (cross walk), 144 sf of permanent construction signs, 40 lf of 42" ornamental steel pickett fence, 385 lf of removal of pavement markings. See attached file.