Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Ridge Road Project shall consist of approx. 2,600 LF of 12" waterline and 100 LF steel casing by bore along Ridge Road. Sunset Project shall consist of approximately 900 LF of waterline replacement along Sunset Road from Crestview to Grandview.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
This RFP is for the replacement of Bridge 1-185 on Oak Ridge Road. The project involves replacing an existing corrugated metal pipe with a precast concrete frame, minor roadway reconstruction, guardrail installation, and placement of riprap to address corrosion and hydraulic inadequacy.
Posted Date
Dec 22, 2025
Due Date
Jan 20, 2026
Release: Dec 22, 2025
Close: Jan 20, 2026
This RFP is for the replacement of Bridge 1-185 on Oak Ridge Road. The project involves replacing an existing corrugated metal pipe with a precast concrete frame, minor roadway reconstruction, guardrail installation, and placement of riprap to address corrosion and hydraulic inadequacy.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide construction services, including, but not limited to complete waterline, service line, and meter box replacement for the manor apartments.
Posted Date
Dec 9, 2025
Due Date
Jan 9, 2026
Release: Dec 9, 2025
Close: Jan 9, 2026
Provide construction services, including, but not limited to complete waterline, service line, and meter box replacement for the manor apartments.
AvailableProcurement for complete waterline, service line, and meter box replacement at Manor Apartments, including temporary water service and site restoration.
Posted Date
Dec 9, 2025
Due Date
Jan 9, 2026
Release: Dec 9, 2025
Close: Jan 9, 2026
Procurement for complete waterline, service line, and meter box replacement at Manor Apartments, including temporary water service and site restoration.
AvailableProject includes approx. 5,000 LF of waterline replacement to 8 PVC waterline service connections to the new 8 waterline will extend from the existing meter pits. Valves will be analyzed to allow for phasing of switch-over from the existing waterline to the waterline replacement.
Posted Date
Dec 1, 2025
Due Date
Jan 6, 2026
Release: Dec 1, 2025
Close: Jan 6, 2026
Project includes approx. 5,000 LF of waterline replacement to 8 PVC waterline service connections to the new 8 waterline will extend from the existing meter pits. Valves will be analyzed to allow for phasing of switch-over from the existing waterline to the waterline replacement.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.