Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Department of Veterans Affairs is issuing a Request for Quotes (RFQ) to replace two existing steam condensate pumps with two new pumps at the Washington DC VA Medical Center. The contract period will begin on January 19, 2026, and end on January 18, 2027. The response due date is January 19, 2026, at 10:00 a.m. EST.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Replace SCI steam coils.
Posted Date
Dec 17, 2025
Due Date
Feb 4, 2026
Release: Dec 17, 2025
Close: Feb 4, 2026
Replace SCI steam coils.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Department of Veterans Affairs (VISN 12 / Oscar G. Johnson VA Medical Center) issued a presolicitation for construction project #585-21-113 to replace condensate steam lines, pumps, PRVs, add bypass lines, replace HPC traps, address associated asbestos, and replace a 6-inch steam valve at the Oscar G. Johnson VA Medical Center in Iron Mountain, MI. The project has an estimated construction magnitude of $1,000,000 to $2,000,000, a period of performance of 180 calendar days after Notice to Proceed, and is set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB). The solicitation and supporting documents will be posted on SAM.gov (on or about 2026-01-12); the presolicitation was posted 2025-12-22 and proposals are due 2026-02-16 at 2:00 p.m. EST.
Posted Date
Dec 22, 2025
Due Date
Feb 16, 2026
Release: Dec 22, 2025
Close: Feb 16, 2026
The Department of Veterans Affairs (VISN 12 / Oscar G. Johnson VA Medical Center) issued a presolicitation for construction project #585-21-113 to replace condensate steam lines, pumps, PRVs, add bypass lines, replace HPC traps, address associated asbestos, and replace a 6-inch steam valve at the Oscar G. Johnson VA Medical Center in Iron Mountain, MI. The project has an estimated construction magnitude of $1,000,000 to $2,000,000, a period of performance of 180 calendar days after Notice to Proceed, and is set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB). The solicitation and supporting documents will be posted on SAM.gov (on or about 2026-01-12); the presolicitation was posted 2025-12-22 and proposals are due 2026-02-16 at 2:00 p.m. EST.
AvailableReplace generator pumps and above ground storage tank. The Contractor shall furnish all labor, materials, tools, supervision, test equipment, shop drawings, technical manuals, transportation, calculations, and safety, necessary to Replace Floors accordance with VA specifications.
Posted Date
Dec 29, 2025
Due Date
Feb 2, 2026
Release: Dec 29, 2025
Close: Feb 2, 2026
Replace generator pumps and above ground storage tank. The Contractor shall furnish all labor, materials, tools, supervision, test equipment, shop drawings, technical manuals, transportation, calculations, and safety, necessary to Replace Floors accordance with VA specifications.
AvailableSeeking a vendor for the follow-on steam and condensate line replacement/construction in the heart of URI's campus. The project includes replacing several hundred yards of high-pressure steam and condensate line, moving/replacing/relocating steam vaults, and replacement of main water line connections in several residence halls. See attached file.
Posted Date
Nov 20, 2025
Due Date
Jan 14, 2026
Release: Nov 20, 2025
Close: Jan 14, 2026
Seeking a vendor for the follow-on steam and condensate line replacement/construction in the heart of URI's campus. The project includes replacing several hundred yards of high-pressure steam and condensate line, moving/replacing/relocating steam vaults, and replacement of main water line connections in several residence halls. See attached file.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →