Open RFPRFQ MSP Terminal 1 EMC BP#1 Enabling Work
Description: Request for Qualifications for Bid Package #1 – Enabling scope consists of Civil Airside Enabling work supporting the Terminal 1 Boiler & Chiller Plant Replacement, Energy Management Center (EMC), and C Concourse expansion. This phased relocation and replacement of existing utilities beneath the aircraft parking apron at Gates C6-C11 while maintaining airport operations and limiting closures to no more than three gates at a time. Work includes relocating the aircraft fueling systems, jet fuel piping, hydrant pits, and isolation valve pits; removing and replacing two 12,000-gallon underground fuel storage tanks while maintaining the existing backup fuel supply until the new system is operational; relocation of electrical duct, cable, and fiber; new storm sewer piping, cleaning, and sealing; relocation of water service; removing and replacing portions of approximately 25,000 square yards of 12-inch and 18-inch concrete aircraft apron pavement, including temporary pavement needed to support construction phasing; and restoring aircraft parking and ground-support-equipment pavement markings; and replacement of the new Passenger Boarding Bridge at C12 with foundations and MEP services. The work will preserve uninterrupted utility service to active gates, with required service interruptions occurring at night, and will maintain the existing aircraft parking and passenger boarding bridge configuration until subsequent EMC and Concourse C construction reconfigures the gates.