Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The University of Texas at Austin is soliciting Statements of Qualifications from architect/engineer firms to serve as Project Architect for Capital Planning and Construction Project No. 102-1603, the Hal C. Weaver Power Plant Turbine Replacement. The RFQ includes UT System front‑end documents and sets requirements for administrative, technical, and HUB/VetHUB submissions; it opened on December 17, 2025. Responses are due January 14, 2026 at 2:30 PM CST, and the procurement is competitive, not a grant program.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Multiple power panels replacement.
Posted Date
Dec 10, 2025
Due Date
Jan 29, 2026
Release: Dec 10, 2025
Close: Jan 29, 2026
Multiple power panels replacement.
AvailableReplace the existing pneumatic ejector with a new electric duplex grinder pump station at the power plant for the electric department. The city municipal electric power plant has a pneumatic ejector station in the basement to handle sewer waste from its four staff bathrooms and locker rooms. This system was installed during the original plant construction in the 1960s and has reached the end of its service life. This project will replace the existing pneumatic ejector with a new electric duplex grinder pump station in the power plant basement.
Posted Date
Jan 5, 2026
Due Date
Jan 21, 2026
Release: Jan 5, 2026
Close: Jan 21, 2026
Replace the existing pneumatic ejector with a new electric duplex grinder pump station at the power plant for the electric department. The city municipal electric power plant has a pneumatic ejector station in the basement to handle sewer waste from its four staff bathrooms and locker rooms. This system was installed during the original plant construction in the 1960s and has reached the end of its service life. This project will replace the existing pneumatic ejector with a new electric duplex grinder pump station in the power plant basement.
The Los Angeles Department of Water & Power (LADWP) issued an Invitation for Bid to replace the generator cooler group at the Castaic Power Plant; all submittal requirements are in the bid document and bids must be submitted electronically via LADWP's eRSP portal. The solicitation was posted 2026-01-05 and has a response deadline on 2026-01-20 (see official eRSP listing); procurement materials and attachments are available only through the buyer's portal. The project scope includes replacement of the Unifin air cooler assembly interfacing with the existing stator housing and reuse of the existing fan cabinet and fans; the estimated value range is approximately $5,000,000–$15,000,000 (AI estimate).
Posted Date
Jan 5, 2026
Due Date
Jan 20, 2026
Release: Jan 5, 2026
Close: Jan 20, 2026
The Los Angeles Department of Water & Power (LADWP) issued an Invitation for Bid to replace the generator cooler group at the Castaic Power Plant; all submittal requirements are in the bid document and bids must be submitted electronically via LADWP's eRSP portal. The solicitation was posted 2026-01-05 and has a response deadline on 2026-01-20 (see official eRSP listing); procurement materials and attachments are available only through the buyer's portal. The project scope includes replacement of the Unifin air cooler assembly interfacing with the existing stator housing and reuse of the existing fan cabinet and fans; the estimated value range is approximately $5,000,000–$15,000,000 (AI estimate).
Provide replacement of uninterruptible power supply (UPS) for the plantwide scada system and onsite switches.
Posted Date
Dec 29, 2025
Due Date
Jan 13, 2026
Release: Dec 29, 2025
Close: Jan 13, 2026
Provide replacement of uninterruptible power supply (UPS) for the plantwide scada system and onsite switches.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis