Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Hampton, GA is soliciting Statements of Qualifications for preconstruction engineering design services for the West King Road Connector-Pedestrian Bridge (GDOT PI# 0021212). The work includes a pedestrian bridge across SR 20, minimum 10-foot shared-use paths, sidewalks, and conversion of a roadway segment to pedestrian-only use over approximately 0.19 miles. SOQs are due January 12, 2026 at 2:00 p.m. EST.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The City of Hampton is seeking qualifications from firms to provide preconstruction engineering design services for the West King Road Connector - Pedestrian Bridge project.
Posted Date
Dec 13, 2025
Due Date
Jan 12, 2026
Release: Dec 13, 2025
Close: Jan 12, 2026
The City of Hampton is seeking qualifications from firms to provide preconstruction engineering design services for the West King Road Connector - Pedestrian Bridge project.
AvailableWork includes construction of the brant bridge connector.
Posted Date
Jan 6, 2026
Due Date
Feb 11, 2026
Release: Jan 6, 2026
Close: Feb 11, 2026
Work includes construction of the brant bridge connector.
AvailablePedestrian bridge construction. This project consists of the construction of a pre-fabricated steel pedestrian bridge approx 260' length at the end of the existing boardwalk in Johnson Park. Construction includes clearing & grubbing, grading, erosion control, drainage, plazas, concrete and paver sidewalk, boardwalk, gateway structures and other items of work.
Posted Date
-
Due Date
Jan 28, 2026
Close: Jan 28, 2026
Pedestrian bridge construction. This project consists of the construction of a pre-fabricated steel pedestrian bridge approx 260' length at the end of the existing boardwalk in Johnson Park. Construction includes clearing & grubbing, grading, erosion control, drainage, plazas, concrete and paver sidewalk, boardwalk, gateway structures and other items of work.
AvailableRequesting quotations from fully qualified and licensed engineering firms to provide a structural conditional assessment of a pedestrian timber bridge.
Posted Date
Dec 23, 2025
Due Date
Jan 14, 2026
Release: Dec 23, 2025
Close: Jan 14, 2026
Requesting quotations from fully qualified and licensed engineering firms to provide a structural conditional assessment of a pedestrian timber bridge.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis