Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes construction of the brant bridge connector.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The work consist of approx 368.1 CY regular excavation; 5,266 SY 1" average depth milling existing asphalt pavement; 211 LF 18" pipe culvert; 2,672 SY 6" thick concrete sidewalk and driveways; 536 LF conduit via directional boring; 1,110 LF sanitary sewer lining.
Posted Date
Aug 15, 2025
Due Date
Feb 11, 2026
Release: Aug 15, 2025
Close: Feb 11, 2026
The work consist of approx 368.1 CY regular excavation; 5,266 SY 1" average depth milling existing asphalt pavement; 211 LF 18" pipe culvert; 2,672 SY 6" thick concrete sidewalk and driveways; 536 LF conduit via directional boring; 1,110 LF sanitary sewer lining.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Hampton is seeking qualifications from firms to provide preconstruction engineering design services for the West King Road Connector - Pedestrian Bridge project.
Posted Date
Dec 13, 2025
Due Date
Jan 12, 2026
Release: Dec 13, 2025
Close: Jan 12, 2026
The City of Hampton is seeking qualifications from firms to provide preconstruction engineering design services for the West King Road Connector - Pedestrian Bridge project.
AvailableThe City of Hampton, GA is soliciting Statements of Qualifications for preconstruction engineering design services for the West King Road Connector-Pedestrian Bridge (GDOT PI# 0021212). The work includes a pedestrian bridge across SR 20, minimum 10-foot shared-use paths, sidewalks, and conversion of a roadway segment to pedestrian-only use over approximately 0.19 miles. SOQs are due January 12, 2026 at 2:00 p.m. EST.
Posted Date
Dec 12, 2025
Due Date
Jan 12, 2026
Release: Dec 12, 2025
Close: Jan 12, 2026
The City of Hampton, GA is soliciting Statements of Qualifications for preconstruction engineering design services for the West King Road Connector-Pedestrian Bridge (GDOT PI# 0021212). The work includes a pedestrian bridge across SR 20, minimum 10-foot shared-use paths, sidewalks, and conversion of a roadway segment to pedestrian-only use over approximately 0.19 miles. SOQs are due January 12, 2026 at 2:00 p.m. EST.
AvailableProvide 5935 - 01-678-7255 SWA5 Adapter, Connector, Ethernet Capability/connectivity Receptacle Connector Assembly
Posted Date
Oct 17, 2025
Due Date
Jan 15, 2026
Release: Oct 17, 2025
Close: Jan 15, 2026
Provide 5935 - 01-678-7255 SWA5 Adapter, Connector, Ethernet Capability/connectivity Receptacle Connector Assembly
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →