Aug 5, 2026
Closes
Feb 18, 2027
Facility Maintenance and Operation Services RFP
Provide facility maintenance and operation services.
Description: Maintenance and Operation Parts, Supplies, Equipment and Services.
SchoolDistrict · TX, US
Original attachments and procurement documents tied to this bid.
Adjacent opportunities open for bidding right now.
Aug 5, 2026
Closes
Feb 18, 2027
Provide facility maintenance and operation services.
Waco Independent School District
School DistrictTX
Jul 4, 2022
Closes
Aug 31, 2027
Provide maintenance supplies, equipment and services including plumbing, electrical and HVAC parts and equipment; floor covering supplies; concrete and sand; doors and hardware; locksmith items; refrigeration supplies; steel; flags and signs; fencing materials; vehicle repairs and upholstery; landscaping materials; fire equipment, supplies and or services; custodial cleaning supplies.
Bureau of Engraving and Printing
FederalDC
Jul 15, 2026
Closes
Sep 15, 2026
To procure contractor services to manage, operate, maintain supplies and perform maintenance and provide technical support for the Wastewater and Storm Water Programs. The WWPP requires services to support the BEP on a 24/7 basis. The WWPP currently consists of four (4) systems: (1) Wiping Solution Wastewater Pretreatment Plant (WSWPP), (2) Plating Wastewater Pretreatment Plant (PWPP), (3) Grease Trap Wastewater Pretreatment Plant (GTWPP), and (4) Wiping Solution Recycling Plant (WSRP). The WWPP includes an on-site lab and a materials storage area. Refer to Attachments 2, 3, 4, and 5 for descriptions of the four (4) systems as well as Attachment 9 and 10 for listings of the equipment that are part of the WSWPP and PWPP, respectively. The GTWPP may be removed during the course of this contract. In addition to these systems, additional systems are currently being researched that will be included in the scope of this requirement. These processes will be limited to elementary neutralization and/or oil and water separation.
Schertz-Cibolo-Universal City Independent School District
School DistrictTX
Aug 10, 2022
Closes
Apr 30, 2027
Transportation Parts, Supplies, Equipment and Services.
Procurement and program contacts connected to Schertz-Cibolo-Universal City Independent School District.