Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Seeking professional design services for comprehensive life-safety upgrades at Appleby Hall, involving building-wide fire suppression, fire alarm system replacement, elevator modernization, and evaluation of an existing wheelchair lift.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Provide professional design services for a comprehensive life-safety upgrade to hall, including building-wide fire suppression, a complete fire alarm system replacement, and modernization of the building's sole elevator, with associated life-safety, code, and systems coordination; fire suppression is currently limited primarily to mechanical and crawl spaces. The building has an existing addressable fire alarm control panel and annunciator, installed approximately five years ago; despite the addressable panel, much of the building remains configured in zones due to legacy wiring and devices, limiting system functionality; fire alarm notification devices (horns, strobes) are outdated, incomplete, and not consistently code-compliant throughout the building; fire pump controller located in the basement has failed.
Posted Date
Jan 7, 2026
Due Date
Jan 27, 2026
Release: Jan 7, 2026
Close: Jan 27, 2026
Provide professional design services for a comprehensive life-safety upgrade to hall, including building-wide fire suppression, a complete fire alarm system replacement, and modernization of the building's sole elevator, with associated life-safety, code, and systems coordination; fire suppression is currently limited primarily to mechanical and crawl spaces. The building has an existing addressable fire alarm control panel and annunciator, installed approximately five years ago; despite the addressable panel, much of the building remains configured in zones due to legacy wiring and devices, limiting system functionality; fire alarm notification devices (horns, strobes) are outdated, incomplete, and not consistently code-compliant throughout the building; fire pump controller located in the basement has failed.
AvailableWork includes fire alarm system upgrade.
Posted Date
Jan 16, 2026
Due Date
Mar 6, 2026
Release: Jan 16, 2026
Close: Mar 6, 2026
Work includes fire alarm system upgrade.
AvailableConduct the required periodic fire alarm and suppression system testing and inspection within DOC facilities.
Posted Date
Dec 16, 2025
Due Date
Jan 20, 2026
Release: Dec 16, 2025
Close: Jan 20, 2026
Conduct the required periodic fire alarm and suppression system testing and inspection within DOC facilities.
AvailableRelease: Dec 19, 2025
Close: Jan 22, 2026
Fire alarm modernization.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis