CitySC
Posted
Aug 17, 2026
Sep 22, 2026
Park Improvements, Phase II RFP
The scope of work include Construction of a tennis/pickleball court, construction of a playground, fencing, and landscaping.
Description: Procurement of stream debris removal services for the Streamflow Rehabilitation Assistance Program.
SpecialDistrict · NC, US
Original attachments and procurement documents tied to this bid.
Adjacent opportunities open for bidding right now.
CitySC
Posted
Aug 17, 2026
Sep 22, 2026
The scope of work include Construction of a tennis/pickleball court, construction of a playground, fencing, and landscaping.
CityMD
Posted
Aug 18, 2026
Sep 18, 2026
Project includes water main repairs and replacement as necessary, including, but not limited to, replacement/installation of various size new ductile iron pipe, valves, fittings, and appurtenances, renew and replacement of existing water services, large and small (residential) meter settings and meter vaults, replacement/installation of fire hydrants, sidewalk restoration, curb and gutter, roadway paving, sedimentation and erosion control measures and maintenance of traffic, as required.
CityPA
Posted
Aug 20, 2026
Sep 9, 2026
Work shall consist of construction of a new asphalt sports court (basketball/pickleball), application of four coat acrylic sports court surface system and other miscellaneous work. Alternate A - Work shall consist of installing ADA concrete walkways.
CityKS
Posted
Aug 19, 2026
Sep 9, 2026
Junction City lists this as an open Public Works procurement, not a grant program, under the exact title "Citywide Concrete Repair (Phase II)." The official detail page shows a publication time of 8/19/2026 12:00 AM and a closing time of 9/9/2026 10:00 AM. It lists a related document named "CITYWIDE CONCRETE REPAIRS PHASE II," but the posting provides no narrative scope or downloadable PDF, DOCX, or PPT URL.